scaffold Product List and Ranking from 34 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Jul 30, 2025~Aug 26, 2025
This ranking is based on the number of page views on our site.

scaffold Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Jul 30, 2025~Aug 26, 2025
This ranking is based on the number of page views on our site.

  1. null/null
  2. null/null
  3. null/null
  4. 4 日本仮設 Hokkaido//Trading company/Wholesale 本社
  5. 5 null/null

scaffold Product ranking

Last Updated: Aggregation Period:Jul 30, 2025~Aug 26, 2025
This ranking is based on the number of page views on our site.

  1. Next-generation scaffolding "Iq System"
  2. System Hanging Shelf Scaffolding "VMAX"
  3. System scaffolding "YT Lock System"
  4. Panel-type suspended shelf scaffold "Spider Panel"
  5. 4 Next Generation Scaffolding 'Iq SYSTEM Work Procedure Manual'

scaffold Product List

1~15 item / All 190 items

Displayed results

Harax One-Touch High Work Platform FDS-2L

【Freedom Stage】Mobile Indoor Scaffold, compactly foldable for easy transportation. Smooth setup as well.

The steel mobile indoor scaffold "Freedom Stage FDS-2L" secures approximately 3m² of working space with a single unit and can be set up easily with simple procedures. It can be compactly folded, allowing it to be used in elevators during vertical movement within buildings, contributing to a reduction in construction time. It also supports connection, enabling safe work in larger spaces. This product is effective for high-altitude work in construction and event setup. 【Features】 ■ Horizontal movement in a connected state is possible ■ Certified product by the Temporary Construction Industry Association ■ 9 levels of height adjustment Height adjustments: 118, 125, 135, 145, 155, 165, 175, 185, 195 cm Compatible working heights: 288 to 365 cm ■ Can also be used as a rental product ■ Optional items include handrails and ladders Videos are currently being streamed on YouTube. Search for the Harax Channel!

  • Work tools

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Harax One-Touch High Work Platform FDS-L

【Freedom Stage】 Mobile Indoor Scaffolding Easily foldable for compact storage and easy transportation. Smooth setup as well.

■Certified Products by the Temporary Construction Industry Association The steel mobile indoor scaffold 'Freedom Stage FDS-L' secures approximately 3m² of workspace with just one unit and can be set up with simple procedures. It can be compactly folded, allowing for use of elevators during vertical movement within buildings, contributing to a reduction in construction time. It also supports connection, enabling safe work in larger spaces. This product is effective for high-altitude work in construction and event setup. 【Features】 ■ Horizontal movement in a connected state is possible ■ 6 levels of height adjustment Height adjustments: 85, 95, 105, 115, 125, 130 cm Compatible with working heights of 250 to 310 cm ■ Can also be used as a rental product Videos are available on YouTube Search for the Harax Channel!

  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Harax One-Touch High Work Platform FDS-3L

Mobile indoor scaffolding, Freedom Stage. It folds compactly for easy movement. Setup is also smooth.

The steel mobile indoor scaffold "Freedom Stage FDS-3L" is designed to accommodate a working height of 5m and provides approximately 3m² of workspace with easy setup procedures. It comes standard with removable handrails. Its compact foldability allows for use of elevators during vertical movement within buildings, contributing to shortened construction periods. It also supports connection for safer work in larger spaces. This product is ideal for high-altitude work in construction and event setup. 【Features】 - Horizontal movement is possible in a connected state - 7 levels of height adjustment Height adjustments: 185, 225, 245, 265, 285, 305 cm Working height: accommodates heights from 370 to 500 cm - Can also be used as a rental product Videos are available on YouTube. Search for the Harax Channel!

  • Measures to prevent falls down stairs

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Polestar "PS-2/B-2"

The number of steps can be selected from 1 to 4 according to the purpose! A simple scaffold for work on poles.

Fujii Denko's "PS-2/B-2" is a portable scaffold nail used for working on wooden and concrete poles, as well as for climbing utility poles. It is available in a range of step counts from 1 to 4, allowing for selection based on specific needs. It can also be used for communication line construction. 【Features】 ■ Simple scaffold for work on poles ■ Lineup tailored to various applications ■ Suitable for communication line construction *For more details, please refer to the PDF document or feel free to contact us.

  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Transmission line inspection work scaffold "Tower Home"

The main body is lightweight, and the handle is sturdy! A work scaffold used for inspecting transmission lines.

Fujii Denko's "Tower Home" is a work platform for accessing during inspections of power line insulators. The main body is made of lightweight aluminum alloy, and the handle of the hanging hook is made of stainless steel. We offer a diverse lineup tailored to various usage situations. 【Features】 ■ A platform used for inspections of power line insulators ■ The main body is lightweight aluminum alloy ■ The handle of the hanging hook is made of durable stainless steel ■ A lineup that can be selected according to usage conditions *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Transmission Line Work Scaffold "Transmission Ladder"

For jumper wire construction and overhead power line construction! A hanging ladder with a wooden step coated in lightweight alloy.

Fujii Denko's "Transmission Line Suspension Ladder" is a work platform used for transmission line construction, such as jumper wire work. It is covered with lightweight aluminum U-shaped channel material over wooden steps. 【Features】 ■ Work platform used for transmission line construction ■ Wooden steps covered with lightweight aluminum *For more details, please refer to the PDF document or feel free to contact us.

  • others
  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-elevating large formwork scaffold "SPU System"

Slide the scaffolding and formwork alternately with a chain block! This is a system that contributes to safety, labor-saving, and efficiency.

The shortage of skilled workers in specialized professions such as carpenters and roofers has become increasingly serious year by year, and accidents during high-altitude work continue to occur. In the face of various issues faced by construction sites, the "SPU System" was developed to further enhance safety, reduce labor, and improve efficiency in on-site operations.

  • Scaffolding and Support Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Scaffolding for bridge repair work "Single Pipe Hoop Scaffolding"

Safe, speedy, and economical bridge installation scaffolding.

The safety net prevents materials and crushed concrete from scattering, providing workers with a good working environment and a sense of security. The sheet roof allows for all-weather construction and protects against direct sunlight and rain during curing after concrete placement, stabilizing quality. Due to its simple structure, construction time is short even without special skills or equipment. NETIS registration number HK-130002-VR.

  • Protective fence
  • Bridge Materials
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-elevating large formwork scaffold 'SPU System'

Self-elevating large formwork scaffolding developed for constructing tall concrete structures by alternately lifting scaffolding and formwork with a chain block.

The SPU system is a self-climbing large formwork scaffold developed for constructing tall concrete structures such as bridge piers, chimneys, dams, silos, and apartment buildings. It is a system that uses anchors embedded in the concrete as a pivot point to alternately lift the scaffold and formwork using a chain block or crane. Once the scaffold assembled on the ground is fixed to the structure on each side, it will self-climb as a unit on all four sides using an electric chain block. The formwork is adjusted and erected while being suspended from the scaffold by the chain block, allowing for the installation of formwork without distortion or misalignment, ensuring high precision in the construction of the structure. Dismantling can also be done safely by lowering it to the ground.

  • Bridge Construction
  • Dam construction
  • Piles, caissons, sheet piles

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Next-generation scaffolding "TOBILINE"

The next-generation scaffolding "TOBILINE," which excels in "safety, space-saving, and quiet construction noise," registered with NETIS.

This is a catalog for the next-generation scaffolding (new type with anti-fall features) uniquely developed by Sankyo, specializing in wedge-type scaffolding with a new connection method. It has been recognized for three features: the "Safety Guide" that prevents falling accidents, the "Compact Design" that makes effective use of limited space, and the "Consideration for Neighbors" that reduces hammering noise by 66% compared to previous products. It has not only been registered with NETIS but also received approval from the Japan Temporary Construction Association and won the Good Design Award.

  • Construction company
  • Scaffolding and Support Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration