Utilization of new technologies, etc., in long-life repair planning & cost reduction.
In order to receive prioritized, planned, and intensive support for the road maintenance project implemented based on the Basic Plan for Infrastructure Longevity, it is essential!
Priority Support Project ◇ Projects utilizing new technologies ◆ Enterprises of municipalities that have established short-term numerical targets for long-term repair plans The basic items that should be included in the guidelines for long-term repair plans have been updated to include specific policies regarding cost reduction. (R3.4) How should cost reduction be specifically implemented? What are the major challenges in terms of current costs? ◇ Costs of blast method in conventional Rc-1 painting system (scaffolding, waste disposal costs, equipment) ◆ Costs of environmental facilities and safety and health protective equipment for coatings containing harmful substances ◇ Increase in LCC in Rc-2 and Rc-3 painting systems We propose solutions to clear these challenges and reduce initial costs and life cycle costs! ◇ "Earth Coat Anti-Corrosion Painting System" ◆ Neutral water-based stripping agent ECO "STRIPPER" [NETIS: CB-210014-A]
- 企業:三重塗料 営業推進部
- 価格:Other