【AR-PRIMER 12.5 Construction Case】Repair of Rust on Standing Seam Roof + Heat Insulation
The folding board temperature has decreased from 58.7℃ to 35.4℃! Here are some examples of installations in the factory.
We would like to introduce a case of repairing and heat-insulating a corrugated metal roof at a factory. The surface was prepared through scraping and high-pressure washing, followed by the application of 'AR-PRIMER 12.5' via spraying. Heat-insulating paint was then applied. The temperature of the corrugated metal before the work was 58.7℃, but after applying our product, it dropped to 47.9℃, and after applying the heat-insulating paint, it further decreased to 35.4℃. 【Construction Overview】 ■ Surface preparation through scraping and high-pressure washing (Before construction corrugated metal temperature: 58.7℃) ■ Spraying of AR-PRIMER 12.5 (After construction corrugated metal temperature: 47.9℃) ■ Application of heat-insulating paint (After construction corrugated metal temperature: 35.4℃) *For more details, please refer to the PDF document or feel free to contact us.
- Company:SPEC Co., Ltd.
- Price:Other