[Construction Example] PPP-180 Restaurant (Oyama City, Tochigi Prefecture)
Drainage treatment of 36 tons per day is now possible! We will introduce examples of construction in areas without sewage systems.
We would like to introduce the installation of "PPP-180" at a restaurant in Oyama City, Tochigi Prefecture. Although it is relatively in the city center, the location does not have access to sewage, so "PPP-180" was introduced for the construction of the restaurant. After installation, it became possible to treat wastewater at a rate of 36 tons per day, accommodating 180 people. This also led to a reduction in construction time and budget. 【Background for the Installation】 - Although it is relatively in the city center, there is no sewage system. - The work request came from a purification tank manufacturer who received the order from the main contractor. - Construction period: 1 week - Number of workers: 3 *For more details, please refer to the PDF document or feel free to contact us.