Construction method(frp) - List of Manufacturers, Suppliers, Companies and Products | IPROS

Last Updated: Aggregation Period:Mar 11, 2026~Apr 07, 2026
This ranking is based on the number of page views on our site.

Construction method Product List

61~90 item / All 122 items

Displayed results

Anti-corrosion coating and sheet lining method D type, Zickboard T method

Can be applied in wet surfaces and high humidity, easy to install, reducing construction time.

▼Overview The Zickboard T method involves applying an inorganic mortar to a concrete structure or after cross-section repair, and immediately pressing the Zickboard onto it to achieve full adhesion with the concrete structure. This method eliminates the need for support materials and allows for a shortened construction period. ▼Features - The joints of the Zickboard T method are constructed with FRP molded products installed with a corrosion-resistant sealing material, creating a double structure that provides durability to prevent damage at the joint areas. - The inorganic mortar used for adhering the Zickboard can bond to wet surfaces of the concrete substrate, making it suitable for construction in high humidity environments.

  • Sewerage facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anchor panel (ground anchor pressure plate)

Pressure plates for ground anchors. Custom manufacturing is also possible based on the required load and area at the site. Compatible with various types of ground anchors.

This is a composite pressure-bearing plate that combines a grid-shaped panel made of FRP with a steel frame. It features a panel with an opening ratio of approximately 70%, ensuring high water permeability, making it suitable for sites where measures against groundwater are required. It is registered in the anchor construction design calculation system 'ANCHOR'. 【Water Permeability】 The grid-structured panel has a high opening ratio of approximately 70%, providing excellent water permeability. It ensures the water permeability of the ground even in sites where measures against groundwater are necessary. 【Greening】 The grid-structured panel has a high opening ratio of approximately 70%, making it excellent for greening. The grid sections contain vegetation substrates, creating a structure that is difficult for runoff to occur.

  • Slope protection material
  • Road construction
  • Erosion control works
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Non-stop water construction method "FDNS method"

The replacement period for the water tank is 25 years! We recommend updating the construction!

The "FDNS method" is our original "non-stop water method" that allows for construction without water interruption during the renewal of existing water tanks. It is compatible with all manufacturers, including FRP, steel, and stainless steel panel tanks. Pipe and pulp renewal work can also proceed simultaneously. 【Benefits】 ■ Replacement construction utilizing the structure of the water tank ■ No water interruption during renewal work (switching time is minimized) ■ Shortened construction days and reduced costs ■ Bolt assembly type that does not use welding or open flames ■ No need for temporary water tanks or temporary pumps ■ Complies with new earthquake resistance standards *For more details, please download the PDF or feel free to contact us.

  • Water supply facilities
  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Water Treatment Facility (Wastewater Treatment Tank) Jickboard T Method

Introduction to the sheet lining method with high durability, which allows for easy construction and shortened construction periods.

This technology is a corrosion protection method for the inner surface of tanks that can be applied on wet surfaces or in high humidity conditions. After applying a special mortar to the concrete structure or after section repair, a jig board is pressed onto it immediately after application, achieving full adhesion with the concrete structure. This method eliminates the need for support materials, allowing for a shortened construction period. Additionally, FRP molded products are installed with a corrosion-resistant sealing material to create a double structure, providing high durability that prevents damage to the joint areas. 【Features】 ■ Can be applied on wet surfaces or in high humidity ■ Easy application reduces construction time ■ No need for support materials ■ The special mortar for adhesion can bond to wet surfaces of the concrete substrate *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Standard lining method for pool interiors "Plascoat P"

Water quality preservation lining! Samples of white, light blue, and aqua blue are available.

"Plus Coat P" is a product that excels in weather resistance and chemical resistance. Color samples are available in white, light blue, and aqua blue. We offer options for concrete and mortar pools as well as for FRP, aluminum, and stainless steel pools. Additionally, we also introduce the "Plus Coat P PEU-1 specification," which is part of the Ministry of Education, Culture, Sports, Science and Technology's standard specifications for architectural renovation work for pool interiors. 【Features】 ■ Epoxy + Acrylic Urethane ■ For water quality preservation lining ■ Standard type ■ Color samples are available in white, light blue, and aqua blue *For more details, please refer to the PDF materials or feel free to contact us.

  • 2022-07-13_16h24_54.png
  • 2022-07-13_16h25_05.png
  • 2022-07-13_16h25_15.png
  • Plastering and painting work
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-corrosion coating and sheet lining method D type, Zickboard S method.

Coating-type lining method + sheet lining method leads corrosion protection into a new era.

▼Overview The Zick Board S method involves applying a surface preparation material (Zick Resin HE104X) to the concrete structure, followed by the application of an odor-reducing epoxy resin (Zick Light E310 or Zick Light E410) to both the surface preparation area and the back of the Zick Board. The Zick Board is then adhered to the concrete structure immediately after application, creating a full adhesion. ▼Features - The joints of the Zick Board S method are designed with FRP molded products installed with a corrosion-resistant sealing material, creating a double structure that provides durability and prevents damage to the joint area. - As a hybrid structure that fully adheres the sheet lining method using a coating type lining method, it eliminates the need for support materials, allowing for a reduction in construction time.

  • Sewerage facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pin Foundation Method: Example of construction in areas inaccessible to heavy machinery.

Simple foundation construction method for NETIS registration! Introducing examples of construction in areas where heavy machinery cannot enter.

Here is an example of the pin foundation method being implemented in a location inaccessible to heavy machinery. The materials used in this method are only anchor blocks and multiple pins. Both are lightweight, allowing for transportation to be done entirely by human power. Additionally, construction can be easily carried out using handheld electric tools, making it simple to install the foundation. 【Example】 ■ Sail Column Forest Botanical Garden (Fukuoka Prefecture) ■ Structure: 3.0m x 4.0m ■ Materials Used ・ Railing: Ipe wood ・ Floorboard: Ipe wood ・ Structural Material: FRP ■ Foundation Type: DP-S 【Other Examples】 ■ Nakagawa Town Andoku, Seta no Mizo (Fukuoka Prefecture) ■ Structure: Effective Width 2.0m Post Pitch 2.5m 【Materials Used】   Railing … Cedar wood   Floorboard … Cedar wood   Structural Material … Aluminum alloy 【Foundation Type】   DP-M For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Ground foundation construction method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco Bus Reform Comprehensive Catalog Vol. 3

Introducing "Eco Bus Reform," which allows for construction in a short period and significant cost reductions!

This catalog features the new construction method "Eco Bath Reform," which takes into consideration both the environment and people. It is ideal for hotel bathrooms, nursing facilities, public restrooms, and office interiors! In addition to introducing various construction methods such as "Nuri Reform" and "Panel Reform," we also present various repairs including "FRP Lining (crack repair)" and "Wall Rust Baseboard Repair (lower wall bulging)." "Eco Bath Reform" not only creates a comfortable living environment but also provides a clean and pleasant bathroom space at a low cost. Please feel free to download and take a look. [Contents] ■ Introduction of various construction methods ■ Various repairs ■ SET plan introduction/quotation request ■ Q&A, maintenance methods, inquiries ■ Company overview *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation
  • Renovation Design
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair and reinforcement method for structures: "Strand Sheet Method"

Introducing a groundbreaking method that fundamentally solves the problems associated with traditional continuous fiber sheet bonding techniques!

The "Strand Sheet Method" is a repair and reinforcement technique that processes FRP strands, which are impregnated and cured with resin, into sheet form and adheres them to the surfaces of concrete and steel structures using a specialized adhesive. The specialized adhesive also serves as a primer and leveling material. Since resin impregnation and degassing work are not required, sheets can be applied immediately after surface preparation, resulting in reduced construction time and lower costs. Strand sheets are available in a high-elasticity type with a lineup up to 900g/m2, providing greater reinforcement effects with a single layer compared to the toe sheet method. 【Features】 ■ Short construction time and low cost ■ Significant reinforcement effect ■ Simple and high quality ■ Good construction environment ■ The specialized adhesive is grease-like, preventing resin splatter and other issues *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

構造物の補修・補強工法『FORCA(フォルカ)トウプレート工法』

簡単施工で大きな補強効果!FRPプレートによるコンクリート構造物の補修・補強工法

『FORCA(フォルカ)トウプレート工法』は、一方向配列の炭素繊維を 熱硬化性樹脂に含浸させ、板状に成型硬化させたCFRPプレートを接着剤で コンクリート表面に貼り付ける補強工法です。 CFRPプレートは炭素繊維シートと比べて単位幅あたりの強度と剛性が 高いので、補修箇所の全面に貼り付ける必要もなく、間隔を空けての 施工も可能。 施工現場で含浸用の含浸・接着剤を使用しないため、上向き施工での 作業者の負担や養生も軽減できます。 【特長】 ■高強度・高剛性 ■1枚でも大きな補強効果 ■上向き作業での「ダレ」から解放 ※詳しくはPDF資料をご覧いただくか、お気軽にお問い合わせ下さい。

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforced Soil Wall Method RRR-C Method

Cutting soil reinforced earth wall method

The RRR method (Reinforced Railroad with Rigid Facing-Method) is a new soil retention technique (reinforced soil wall) developed as an alternative to traditional retaining wall methods, utilizing the principles of reinforced soil engineering. Traditional retaining walls are structures that, from a mechanical perspective, aim to support external forces (earth pressure) exerted by the soil through the weight of the structure and the ground reaction of the foundation, opposing the soil and embodying a philosophy of countering force with force. In contrast, the reinforced soil wall method promotes the stabilization of the soil itself by placing tensile reinforcement materials within the soil, representing a structural philosophy that seeks to coexist with the soil.

  • Reinforcement and repair materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-corrosion coating and sheet lining method D type, Jickboard K method

Since the sheet adhesion is completed during the formwork removal, it is possible to shorten the construction period.

▼Overview The Zickboard K method involves attaching 2mm Zickboard to the formwork during the construction of treatment facilities and directly adhering it to the concrete structure. Since the application of the Zickboard is completed when the formwork is removed, this method allows for a significant reduction in construction time compared to other sheet lining methods. ▼Features - Zickboard has good workability and can be cut to match the shape of the formwork. It can also be installed using plastic nails or similar fasteners. - The joints and separator ends of the Zickboard K method are equipped with FRP molded panels and corrosion-resistant sealants, providing durability features that prevent damage to the joints. ▼Method Standards Complies with the quality standards of the Japan Sewage Works Agency's "Manual for Corrosion Control and Anti-Corrosion Technology for Concrete Structures in Sewage Systems," specifically the D-type formwork sheet lining method.

  • Sewerage facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anchor panel

Permeable sheets can be installed as needed! Corrections for slope angle and drilling angle can be made up to a maximum of 15°.

The "Anchor Panel" is a pressure distribution plate for ground anchors that combines a fiberglass-reinforced plastic (GFRP) lattice panel with a rigid frame. The rigid frame is protected against corrosion with hot-dip galvanized coating plus urethane paint or polyethylene paint, and the design also takes corrosion protection costs into account. The opening ratio of the pressure distribution surface is over 40%, allowing it to be completely covered in combination with greening work. Depending on the design anchor and soil bearing capacity, it can be selected from 9 standard types, and special sizes can be manufactured according to the pressure distribution area and load. 【Features】 ■ Composite pressure distribution plate combining FRP lattice panel with steel frame (SS400) ■ Opening ratio of over 40%, suitable for greening ■ Lighter and lower in height compared to concrete pressure distribution plates ■ As a secondary product, it does not require a curing period, enabling a reduction in construction time ■ Not limited to specific anchors, can be manufactured according to design loads and dimensions suited to the site *For more details, please refer to the PDF materials or feel free to contact us.

  • panel
  • Wall and rooftop greenery
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Anti-corrosion coating and sheet lining method D type, Zicboard GR method.

Reduction of life cycle costs with a durability of 50 years.

▼Overview The Zick Board GR method has a construction track record of over 20 years, and based on follow-up survey results of operational facilities and promotion test results, it has been verified that even 50 years after completion, it can maintain the performance of "adhesion stability," "sulfuric acid resistance," and "barrier properties," ensuring a service life of 50 years. By having a service life of 50 years, it enables a reduction in lifecycle costs compared to coating-type lining methods and other sheet lining methods. ▼Features - The joints of the Zick Board GR method have a triple structure consisting of FRP molded products on the surface and back, along with corrosion-resistant sealing materials, providing excellent durability functions that prevent damage to the joint area due to stress concentration and other factors. - The Zick grout injected into the back of the Zick Board can also serve as a cross-section restoration process after the removal of deteriorated areas during renovation work.

  • Sewerage facilities
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pipe lining method "SZ Lining"

Achieving the perfect lining for all types of pipes! SZ Method

Our diverse pipe lining technology provides optimal solutions tailored to various customer needs. The "SZ method" involves pulling an SZ liner into the sewer pipe using a manhole, expanding and heating the liner with air and steam to form a standalone pipe within the existing pipe. Even though SZ pipes are thin, they possess standalone pipe strength equal to or greater than that of rigid PVC pipes for sewer use. Furthermore, they excel in durability, oil resistance, and acid resistance, with a lifespan that is virtually permanent. 【Features】 ■ Formation of robust FRP pipes (standalone pipes) within existing pipes ■ Standalone pipe strength equal to or greater than that of rigid PVC pipes for sewer use ■ Flow capacity equal to or greater than that of new pipes ■ Excellent durability and chemical resistance *For more details, please refer to the PDF materials or feel free to contact us.

  • Pipeline Construction
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair and Reinforcement Method: "Cross-Section Restoration and Surface Protection Repair Method"

We will aim to improve the durability of existing concrete structures.

The "Cross-Section Repair and Surface Protection Repair Method" is a technique that involves removing deteriorated areas of existing concrete structures and applying polymer cement mortar to restore the cross-section, thereby improving the durability of the existing concrete structures. In cases where the removal area of the existing concrete is extensive, repair and reinforcement materials such as FRP grids are placed on the surface of the concrete structure to ensure integration with the existing concrete. This method is applicable to concrete structures that have deteriorated due to salt damage, carbonation, freeze-thaw cycles, etc. 【Features】 ■ Improved durability ■ Increased compressive strength and adhesion strength ■ High filling capability ■ Enhanced rust prevention effect *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Instant curing coating method "Swael® Water Supply System"

No foaming occurs due to humidity, and it hardens completely even at sub-zero temperatures (below -15°C).

The "Swael® Potable Water [Corrosion and Waterproofing] System" is a revolutionary instant curing coating system developed for corrosion and waterproofing of concrete structures for potable water, based on a two-component polyurea resin (product name: Swael) consisting of isocyanate and a special curing agent, and a spray technology that mixes and ejects these two components. The gel time after spraying is extremely short, just a few seconds, allowing for walking on horizontal surfaces after 30 seconds. Therefore, the curing time after construction can also be shortened. Additionally, due to the short gel time, it is easy to apply thick coatings continuously on ceiling and wall surfaces without sagging, allowing for quick and efficient construction. [Features] ■ Instant curing ■ Cures regardless of humidity and temperature ■ Improved efficiency with a mechanical construction system ■ Excellent workability on ceiling and wall surfaces *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Instant Hardening Coating Method "Swael Upper Water System"

The curing time after construction can also be shortened! Material management is easy, and uniform quality and film thickness management can be achieved.

We would like to introduce our instant curing coating method, the "Swael Drinking Water System." This revolutionary instant curing coating system is developed based on a spray technology that mixes and ejects two components: isocyanate and a special curing agent, which form a polyurea resin. It is designed for corrosion protection and waterproofing of concrete structures for drinking water. The use of a two-component high-pressure collision mixing spray machine has significantly reduced labor and dramatically improved construction efficiency. 【Technical Features】 ■ Instant curing ■ Cures regardless of humidity and temperature ■ Increased efficiency with a mechanical construction system ■ Excellent workability for ceilings and walls *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Strand Sheet JCM Embedded Method for Floor Slab Reinforcement

We will introduce a reinforcement method for the upper surface of floor slabs using continuous fiber FRP sheets and ultra-rapid hardening mortar!

The "Strand Sheet JCM Buried Method" is a groundbreaking technique that evolves the conventional bonding reinforcement method using continuous fiber sheets on the top surface of slabs. By combining a joint epoxy resin adhesive with a super-fast hardening fiber-reinforced polymer cement mortar and strand sheets, it enables an overwhelming reduction in construction time. Furthermore, since strength is achieved approximately 3 hours after construction, it also allows for a reduction in traffic regulation time. 【Features】 ■ Realizes rapid construction ■ Short curing time ■ Significant reinforcement effect ■ High durability *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Repair and reinforcement method for structures: "FORCA Tow Sheet Method"

Applicable for the repair of corrosion in steel components! We provide excellent workability, significant repair and reinforcement effects, and high quality.

The "Toshit Method" is a repair and reinforcement technique for steel and concrete structures using continuous fiber sheets. Reinforcement with only resin and carbon fibers prevents rust and is highly effective against salt damage. It offers a high reinforcement effect with high-strength, high-elasticity continuous fibers arranged in one direction. In addition, we also offer repair and reinforcement methods such as the "Strand Sheet Method," which involves attaching sheet-like FRP strands with a special adhesive, and "Toe Anchors." 【Features】 ■ Strong and lightweight continuous fibers ■ High waterproofing properties ■ Simple construction ■ No rust formation ■ Compliant with RC design methods ■ Applicable for repairing corroded steel members *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Pin Foundation Construction Example】A place with important historical sites and valuable trees.

Simple foundation construction method for NETIS registration! Introducing examples of construction in locations with important historical sites and valuable trees.

Here are examples of the pin foundation method used in locations with important historical sites and significant trees. This method involves driving small-diameter pins through a stabilization block, eliminating the need for excavation of the ground surface. It is an effective foundation method when you want to protect important historical sites as much as possible or when you want to avoid damaging the roots of significant trees. 【Example 1】 ■ Nationally Designated Historic Site: Ikebene Temple Ruins (Kumamoto Prefecture) ■ Structure: Effective width 1.5m, column pitch 2.5–3.8m ■ Materials Used: ・Handrail: Ipe wood, recycled wood, aluminum alloy ・Flooring: Ipe wood ・Structural materials: FRP ■ Foundation Type: DP-75, SP 【Example 2】 ■ Historical Park: Maru Chijo ■ Structure: Effective width 1.5m, column pitch 2.0m ■ Materials Used:  Handrail, flooring, structural materials: Cedar wood ■ Foundation Type: DP-M 【Example 3】 ■ Amagafubaru Rural Park ■ Structure: Effective width 1.8m, column pitch 2.5m ■ Materials Used:  Handrail: Ipe wood, Chatoba wood  Flooring: Ipe wood  Structural materials: Aluminum alloy, Angelim wood, Ipe wood ■ Foundation Type: DP-M For more details, please refer to the catalog or feel free to contact us.

  • Civil Engineering Method
  • Ground foundation construction method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Peeling Method

Attach a special blade to the stripping machine! Smoothly strip waterproof materials and flooring materials with low vibration!

The "peeling method" is a technique that removes flooring materials using a special blade attached to a peeling machine, allowing for the removal of adhered flooring materials, waterproofing materials, and more. There are types that use micro-vibration at the blade tip and non-vibration types, allowing for the selection of machines based on the application. It is now possible to reliably peel off urethane waterproofing, as well as P tiles and resin mortars that have been strongly bonded with epoxy adhesives, which were previously difficult to remove. Residual adhesives and primers are completely removed using a combination of cutting methods and shot blasting methods. 【Features】 ■ Uses blades with peeling widths from 150mm to 370mm ■ Achieves high power with a low vibration design ■ Allows for peeling and removal without damaging the substrate ■ Offers a variety of power sources including motors, batteries, and engines ■ Large machines enable construction over large areas in a short period *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Strand sheet reinforcement method

This is a groundbreaking method that fundamentally solves the problems of sheet swelling and defects associated with conventional continuous fiber sheet bonding techniques.

This technology involves processing FRP strands that have been impregnated and cured with resin into sheets, which are then adhered to the surface of concrete structures using a specialized adhesive for repair and reinforcement methods. It can be applied to reinforcement measures for cantilever slabs in concrete bridge decks and the upper parts of main girders. Additionally, it can be used for concrete slabs that suffer from insufficient strength due to floor slab improvements or the increased size of loading vehicles corresponding to the year of bridge construction. The effectiveness of this method increases particularly in areas with heavy traffic where road restrictions occur. 【Features】 ■ Immediate sheet application after surface preparation ■ Excellent workability without the need for resin impregnation or degassing ■ Short construction period and cost-effective ■ Simple and high quality ■ Significant reinforcement effect *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

IH (Induction Heating) Device System

Introduction to IH-type coating removal using IH (induction heating) device systems.

The "IH (Induction Heating) Device System" is a system that combines the "RPR1650 System" developed by Norway's RPR Technology with the "Cooling Water Supply Unit" manufactured by Nihon Bridge Co., Ltd., designed to strip existing paint from steel bridges. The benefits of the IH device are threefold: "reduction of environmental impact and ensuring worker safety," "efficiency in work speed," and "reduction of industrial waste." It can be used for various applications beyond just steel bridges. 【Benefits of the IH Device】 ■ Minimizes dust dispersion ■ Allows for safe and hygienic stripping ■ Can strip paint in a flat manner in one operation ■ Industrial waste consists only of the stripped paint ■ Significantly reduces waste disposal costs *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hareform (floor sheet installation)"

Since it is simply applied over the existing floor, the installation takes about half a day to complete! An environmentally friendly ecological method.

"Hariform" is a renovation method that involves directly applying decorative sheets to the walls and ceiling of the bathroom, and attaching foam multilayer vinyl flooring to the floor. It uses a high-performance CF sheet specifically designed for bathroom floors, allowing for an easy refresh of just the floor. Since it is simply applied over the existing floor, the installation takes about half a day to complete. Additionally, because it is made of a cushioned foam sheet, it has excellent thermal insulation properties. If the existing floor is tiled, it can get quite cold in winter, but by applying this flooring material, it provides excellent insulation, making it less likely to feel chilly when touched with bare feet, thereby reducing the risk of heat shock. [Features] - High-performance flooring sheet specifically for bathrooms - Measures against heat shock - Can be installed without damaging the existing floor - No waste or noise generated *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation
  • Renovation Design
  • panel
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Boarding-type scraper "HBS-2000"

Adopting an environmentally friendly water-cooled diesel engine! Quickly stripping the road waterproof layer with low noise and low dust!

The "HBS-2000" is a ride-on scraper that can remove waterproofing materials without damaging the base material. Thanks to its high power, it can remove residual asphalt (less than 10mm) completely. The scraper unit can be repositioned to one of three locations: left, center, or right of the machine, and the blade tips are available in 300mm and 150mm sizes (with 300mm as standard equipment). 【Features】 ■ Suitable for removing waterproof layers from bridges and elevated bridges, cushioning materials from stadiums, and FRP flooring from parking lots. ■ Capable of removing waterproofing materials without damaging the base material. ■ High power allows for the removal of residual asphalt (less than 10mm) completely. ■ Achieves labor savings and shortens construction periods. ■ Equipped with an environmentally friendly water-cooled diesel engine. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Protective Lining Method (Lifetex Method)

A surface coating system with long-term durability that is effective for anti-corrosion measures and salt damage prevention, while maintaining performance.

We would like to introduce the "Protective Lining Method (Lifetex Method)." We offer various methods, including the "Lifetex LH Method," which combines the ability to prevent the intrusion of chloride ions, water, oxygen, and carbon dioxide—causes of concrete deterioration—with crack-following properties that can accommodate hairline cracks, as well as the "Lifetex LA Method," which maintains the performance of concrete spalling. You can choose according to your needs. 【Lineup】 ■ Lifetex LH Method ■ Lifetex LA Method ■ Lifetex V-FRP Method *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Factory Reconstruction Method "Connection Method"

Integrating the buildings while ensuring smooth flow to improve work efficiency 【Contributing to increased productivity and the smooth operation of production lines!】

The "Connection Construction Method" refers to a technique where a new building (or an extension) is constructed between two or more existing buildings that are located apart from each other, aligning the floor levels to integrate the previously independent structures. This construction creates pathways between areas that were originally separate buildings, leading to expected benefits such as improved productivity and smoother production lines. [Recommended for such factories!] ■ Want to make the most of existing buildings ■ Want to create connections between each building that stands independently on the site *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

NAV-G Method (UV Specification)

Preventive measures against flaking that are visible on the concrete surface, such as cracks, even after repairs.

The "NAV-G Method (UV Specification)" allows for the formation of a highly transparent FRP on concrete surfaces by applying and impregnating acrylic resin adhesive onto a special fiber sheet, enabling the observation of new crack occurrences and serving as a new method for preventing peeling. It ensures transparency that is not found in conventional peeling prevention methods, with expectations for sustained visibility over the long term. 【Features】 ■ Visibility ■ Shortened construction period ■ Weather resistance ■ Mechanical properties ■ Applicability in construction *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration