Construction method Product List and Ranking from 1595 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. ナカムラ Hyogo//Other construction industries
  3. 中外商工 Osaka//Building materials, supplies and fixtures manufacturers
  4. 4 HOKOKU ENGINEERING CO.,LTD. Osaka//Other construction industries
  5. 5 水研 Shiga//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Dec 17, 2025~Jan 13, 2026
This ranking is based on the number of page views on our site.

  1. Construction method for achieving large wooden structures: "NK Method" ナカムラ
  2. Lining Method for Sewer Facilities "Plascoat E/L" 中外商工
  3. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  4. 4 Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.
  5. 5 側溝修繕工法『ネプラス工法』<施工前後の写真付き資料進呈> ネプラス工法全国会 本部

Construction method Product List

4051~4065 item / All 4280 items

Displayed results

[Helpful Materials Provided] Explanation of the 'Void Injection Filling Method' to Prevent Injuries

Install PVC pipes for injection! There are advantages such as 'low noise and vibration generation'.

In the "Void Injection Filling Method," if there are depressions or voids around the building, cement is injected to fill them. First, a PVC pipe is installed for injection. Then, a cement slurry is prepared and injected into the void areas. There are advantages such as "possible construction in a short period" and "minimal noise and vibration." 【Process Flow】 (1) Install PVC pipes for injecting cement slurry (2) Prepare the cement slurry for injection (3) Inject the cement slurry into the void areas *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-Supporting Manhole Rehabilitation Method SS Hole System

Acquisition of inspection certification! Types 1 to 4! Manhole depth 10m! Construction method using high acid resistance and high load-bearing reinforced plastic composite pipes. No special construction techniques required!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Being self-supporting, it does not require the residual strength from diagnostic surveys of existing manholes and can also accommodate unreinforced manholes, providing a load-bearing capacity equivalent to new installations. This method does not require special construction techniques, allowing for rehabilitation using general construction skills anywhere in Japan. As a factory-produced product, it has consistent quality with no variability and stable load-bearing capacity. The internal cross-section is maximally secured. 【Features】 ■ Constructability: Does not require special construction techniques, allowing for rehabilitation with general construction skills. ■ Acid Resistance: Reinforced plastic composite pipes with over 40 years of proven performance. ■ Load Capacity: Factory-produced, ensuring consistent quality and stable load-bearing capacity. ■ Seismic Resistance: Reinforced plastic composite pipes with high strength and excellent seismic resistance. 《Acquired the Construction Technology Review Certificate (Sewage) from the Japan Sewerage New Technology Organization  March 18, 2021, No. 2021  Scope of expansion: Manholes No. 1 to No. 4, up to a depth of 10m》 *For more details, please refer to the PDF materials or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of standard construction procedures for obtaining inspection certification for self-supporting manhole rehabilitation methods!

No special materials or construction techniques are required, and it can be completed in a short period of about 4 to 5 days! Here is an introduction to the construction procedure of the SS Hall system!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Depending on the conditions, it can be completed in a short construction period of about 4 to 5 days! The construction steps are as follows: 1. Clean and remove the deteriorated sloped walls of the manhole, the vertical walls of the existing manhole, and the invert. 2. Install the "Reinforced Plastic Composite Pipe Manhole" into the existing manhole, filling the gap between the reinforced plastic and the vertical wall of the existing manhole with backfill material. 3. Install the foundation block and slab block of the SS hole, then backfill after installing the sloped walls, adjustment rings, and iron covers to complete the process. 《Construction Technology Examination Certificate (Sewage) obtained March 18, 2021, No. 2021 Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10 meters》 *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Self-Supporting Manhole Rehabilitation Method for Construction Consultants

Supports inspection certificates No. 1 to 4 up to 10m! No special construction techniques required! A method using reinforced plastic piping materials with high acid resistance and high load capacity.

The "SS Hole System" is a self-supporting manhole rehabilitation method that simply extends the lifespan of aging manholes. It is widely adopted by construction consultants, construction managers, and civil engineers. This method does not require any special construction techniques, allowing rehabilitation to be performed in any region of Japan using standard construction practices. As a factory-produced product, it has stable load-bearing capacity without quality variations. Additionally, it uses reinforced plastic composite pipes with over 40 years of proven performance, demonstrating high acid resistance and seismic resistance, while also maintaining a slim profile to maximize the internal cross-section. 【Features】 ■ Workability: Can be rehabilitated using standard construction techniques without the need for special skills ■ Acid Resistance: Reinforced plastic composite pipes with over 40 years of proven performance ■ Load-Bearing Capacity: Factory-produced, ensuring stable load-bearing capacity without quality variations ■ Seismic Resistance: High-strength reinforced plastic composite pipes with excellent seismic resistance 《Construction Technology Review Certificate (Sewage) obtained  March 18, 2021, No. 2021  Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10m》

  • Renovation and repair methods
  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] 'Self-Supporting Manhole Rehabilitation Method' No. 1-4, up to 10m!!

Introducing case studies of the self-supporting manhole rehabilitation method "SS Hole System"! Achieving shortened construction time and quality assurance through the use of factory-produced products!

The "SS Hole System" by Aibuild is a new manhole rehabilitation method that uses reliable materials traditionally employed, allowing for rehabilitation without relying on the residual strength of existing manholes. It is designed to meet seismic levels 1 and 2, providing peace of mind! Additionally, its ease of installation means it can be implemented in any region across the country. 【Construction Examples】 Client: Fukuoka City Road and Sewer Bureau Construction Year: 2016 Construction Details: Rehabilitation of Manhole No. 3 Manhole Depth: h=2.43m Remarks: SS Hole φ1350, 1 unit Client: Fukuoka City Road and Sewer Bureau Construction Year: 2017 Construction Details: Rehabilitation of Manhole No. 1 Manhole Depth: h=2.08m Remarks: SS Hole φ800, 1 unit Client: Fukuoka City Road and Sewer Bureau Construction Year: 2018 Construction Details: Rehabilitation of Manhole No. 3 Manhole Depth: h=3.69m Remarks: SS Hole φ1350, 1 unit Client: Fukuoka City Road and Sewer Bureau Construction Year: 2020 Construction Details: Rehabilitation of Rectangular Manhole 2000×2000 Manhole Depth: h=6.09m Remarks: SS Hole φ1800, 1 unit *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction of standard construction procedures for obtaining inspection certification for self-supporting manhole rehabilitation methods!

No special materials or construction techniques are required, and it can be completed in a short period of about 4 to 5 days! Here are the construction steps for the SS Hall System!

The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Depending on the conditions, it can be completed in a short period of about 4 to 5 days! The construction steps are as follows: 1. Clean and remove the deteriorated sloped walls of the manhole, as well as the vertical walls and invert of the existing manhole. 2. Install the "Reinforced Plastic Composite Pipe Manhole" into the existing manhole and fill the gap between the reinforced plastic and the vertical wall of the existing manhole with backfill material. 3. Install the foundation block and slab block of the SS hole, then backfill after installing the sloped wall, adjustment ring, and iron cover to complete the process. 《Construction Technology Review Certificate (Sewage) obtained March 18, 2021, No. 2021 Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10 meters》 *For more details, please refer to the PDF document or feel free to contact us.

  • Manhole body
  • Dam construction
  • Water Supply Facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction Technology Examination Certificate: Self-supporting manhole rehabilitation No. 1-4, 10m, suitable for short construction.

A self-supporting manhole rehabilitation method that has received construction technology examination certification maintains strength equivalent to that of a newly installed manhole! Here is an explanation of the construction procedure.

For manholes that require rehabilitation, particularly those that are severely deteriorated and cannot secure the required strength in their current condition, or are expected to be unable to secure strength in the future, we have developed the "SS Hole" as a rehabilitation method that has strength equivalent to newly installed manholes. 【Construction Procedure】 1. Remove the deteriorated manhole up to the sloped wall. ↓ 2. Clean and remove the vertical walls and invert of the existing manhole. ↓ 3. Install the "reinforced plastic composite pipe" certified by the Sewerage Association into the existing manhole (compatible with sizes 1 to 4). ↓ 4. Fill the gap between the reinforced plastic composite pipe and the vertical wall of the existing manhole with backfill material. ↓ 5. Install the foundation block for the SS Hole. ↓ 6. Install the slab block for the SS Hole. ↓ 7. After installing the sloped wall, adjustment ring, and iron cover, backfill to complete. *Construction duration is approximately 4 to 5 days (depending on conditions).

  • Manhole body

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Kabe-gami Revolution Inc. Senior Interview

"Cross makeup will surprise everyone when they see and touch it in person." Introduction to the senior interview!

Our company operates as the headquarters for the "Cross Make" agency, which revitalizes without replacing the cross. Here, we would like to share a part of an interview with a senior who is active in this field. ■ Cross Make broke the limits of my main business. (Excerpt) After working at a moving company, I started my own house cleaning business. However, I hit a ceiling with just house cleaning, and I could see the limits. It was during this time that I encountered the wallpaper revolution. The house cleaning industry has many players, so now this Cross Make has become my powerful weapon. ■ Anyone who sees and touches Cross Make will be amazed! (Excerpt) I always had the desire to work at my own discretion, and I learned about the wallpaper revolution while working as a driver. Since I started from complete scratch, I had many uncertainties at the beginning of my independence and consulted the headquarters by phone, receiving various help. There are still many people who do not know about Cross Make, and when I carry out the work, they are surprised and delighted. I believe it is a suitable job to start individually. *For more details, please refer to the PDF materials or feel free to contact us.

  • Paper cloth

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Information】Chipping work in narrow areas and complex surface shapes is possible with a rotating lance.

For more efficient water jet cutting work on uneven surfaces in narrow spaces, leave it to the rotary lance method!

Introducing the "Rotary Lance" of the Water Jet Lance. The "Rotary Lance" allows for high-efficiency work over a wider area compared to a hand lance by rotating the nozzle at the tip, making it suitable for tasks such as paint removal and surface preparation. 【Features】 <Hand Lance> ■ Enables chipping through ultra-high-pressure water injection from a single-hole nozzle head to the substrate. ■ Using an angle conversion fixture on the lance part allows for chipping in narrow spaces. <Rotary Lance> ■ Air rotary lance suitable for paint removal and surface preparation. ■ By rotating the nozzle at the tip, it enables high-efficiency work over a wide area. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Information】Cutting large and hard materials without producing fire AWJ/AWSJ

Achieve speedy dismantling during machinery updates and renovation work at plants! Demonstrates its power in sites where fire cannot be used!

We would like to introduce the cutting devices used in the water jet cutting method. The "Abrasive Water Jet (AWJ)" cleanly cuts hard materials such as metal, concrete, and composite materials. It can accommodate both circular and flat shapes, as well as various materials. The "Abrasive Suspension Jet (AWSJ)" can form a focused jet stream, demonstrating high cutting capability and allowing for underwater cutting without generating air mist. 【Features】 ■ Abrasive Water Jet (AWJ) - Cleanly cuts hard materials such as metal, concrete, and composite materials - Accommodates both circular and flat shapes, as well as various materials ■ Abrasive Suspension Jet (AWSJ) - Demonstrates high cutting capability due to the ability to form a focused jet stream - Allows for underwater cutting without generating air mist - Can be used outdoors without humidity restrictions - Capable of cutting tubes with an inner diameter of 40mm or more, allowing access to narrow environments *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Information] Streamlining the process of "removing" artificial turf and waterproof layers, etc.

We can perform construction tailored to the site, such as whether or not there is vibration. Leave the "peeling" work to us!

The "HBS-2000" is a ride-on scraper capable of removing waterproofing materials without damaging the base material. Thanks to its high power, it can remove residual asphalt (less than 10mm) as well. The scraper unit can be repositioned to one of three locations: left, center, or right of the machine, and the blade tips are available in 300mm and 150mm sizes (300mm is standard equipment). 【Features】 ■ Ideal for removing waterproof layers from bridges and elevated structures, cushioning materials from stadiums, and FRP flooring from parking lots. ■ Capable of removing waterproofing materials without damaging the base material. ■ High power allows for the removal of residual asphalt (less than 10mm). ■ Achieves labor savings and shortens construction periods. ■ Equipped with an environmentally friendly water-cooled diesel engine. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Information】Achieving the smoothing and strengthening of concrete floors - Placon Floor

You can choose the floor finish according to your purpose! It is also possible to use a polished floor as a design element!

"Placon Floor" is a revolutionary flooring finishing method that directly polishes the concrete substrate to achieve a finished surface. This method polishes the concrete floor to a mirror-like state, enhancing both the gloss that reflects light and the durability of the floor. Additionally, by removing the weak surface layer of the concrete and improving its strength, it prevents whitening. Since this method utilizes the existing concrete as is, there is no need for finishing materials. It can be completed in a shorter time frame compared to painted floors, natural stone, or tiles. Furthermore, there is no curing period required like with painted floors, allowing for immediate business operations after construction (post-polishing). We offer plans tailored to your needs, from roughening to mirror finish. 【Features】 ■ Revolutionary ■ Improved floor durability ■ Significantly reduced construction time ■ Beautiful mirror finish ■ Substantial overall cost reduction *For more details, please refer to the catalog or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Information】 "Metal Cutting by Diamond Method" Safe Cutting and Dismantling

By selecting diamond tools according to the type of metal, it is also possible to reduce the generation of sparks during cutting!

Our "Diamond Method" metal cutting technology can cut and drill various materials, from metal to ultra-high reinforced concrete. Large equipment can be cut and dismantled in a short time, and it is easy to extract solidified iron debris. For example, it is widely used in: - Modifications and construction of machinery related to plants - Petrochemical plants - Steel mills and power plants, etc. Dry cutting using air cooling is possible without using cooling water. During cutting, it can be performed without generating an open flame, and remote operation is feasible, making it a preferred option for many companies as an alternative to gas cutting. 【Features】 ■ Capable of cutting complex shapes ■ Can cut both metal and ultra-high reinforced concrete ■ Dry cutting using air cooling without the use of cooling water ■ Can be performed without generating an open flame during cutting ■ Remote operation allows for flexibility in the work location *For more details, please refer to the PDF document or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Information] Cutting and drilling structures without using water - Dry diamond method

No need for treatment of sludge water during cutting and drilling, and dust is also vacuumed. It is also possible to prevent drainage freezing accidents in cold regions!

Compared to heavy machinery dismantling, the "diamond method" allows for cutting and drilling with low vibration and low noise, and is widely used in civil engineering and construction projects. However, a new problem has arisen: wastewater sludge from the cooling water used during operations contaminates the surrounding environment. The "dry diamond method" is a new technique that eliminates wastewater sludge while taking advantage of the benefits of the diamond method. In demolition and renovation work, where reducing environmental impact is essential, this method will serve as a guideline for the future. 【Features】 ■ ECO method that eliminates wastewater sludge ■ Low noise and low vibration method ■ Prevents accidents caused by wastewater freezing in cold weather operations ■ No need for post-processing; can be treated directly as industrial waste *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Information] Cutting and removal of structures underwater is possible - Underwater Diamond Method

Experienced divers carry out all the construction work! We handle a wide range of highly specialized underwater construction!

Reliable technology backed by proven results is essential for underwater work, which often comes with many constraints. Our company has undertaken numerous projects based on diamond cutting methods in underwater construction, earning a high level of trust. We handle a wide range of underwater tasks, including cutting, drilling, and anchoring. Please feel free to consult us when considering underwater construction. 【Features】 ■ Capable of various underwater construction tasks, including cutting and drilling using underwater diamond methods ■ Peace of mind with our experienced and specialized staff with a wealth of achievements ■ Implementation of safe and reliable construction using new equipment and technology *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration