Introduction of standard construction procedures for obtaining inspection certification for self-supporting manhole rehabilitation methods!
No special materials or construction techniques are required, and it can be completed in a short period of about 4 to 5 days! Here is an introduction to the construction procedure of the SS Hall system!
The "SS Hole System" is a rehabilitation method that simply extends the lifespan of aging manholes. Depending on the conditions, it can be completed in a short construction period of about 4 to 5 days! The construction steps are as follows: 1. Clean and remove the deteriorated sloped walls of the manhole, the vertical walls of the existing manhole, and the invert. 2. Install the "Reinforced Plastic Composite Pipe Manhole" into the existing manhole, filling the gap between the reinforced plastic and the vertical wall of the existing manhole with backfill material. 3. Install the foundation block and slab block of the SS hole, then backfill after installing the sloped walls, adjustment rings, and iron covers to complete the process. 《Construction Technology Examination Certificate (Sewage) obtained March 18, 2021, No. 2021 Scope of application expanded: Manholes No. 1 to No. 4, up to a depth of 10 meters》 *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Method Features】 ■ No special materials or construction techniques are required ■ Construction is possible while using wastewater *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
The infrastructure structures such as sewers, roads, bridges, and tunnels that were developed in our country after the period of rapid economic growth are expected to rapidly deteriorate in the future, raising concerns about falling into dangerous conditions. It is necessary to strategically maintain and update the infrastructure that will age simultaneously. Our company has a wealth of experience in the field of sewer construction. We prioritize the safety of those working on-site and the improvement of work efficiency, and we conduct daily research to understand what is needed. Moving forward, we will continue to listen directly to the voices from the field, create products that are first and foremost for the site, and strive to be of service. We sincerely ask for your continued support and patronage.