Construction method Product List and Ranking from 1597 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  3. null/null
  4. 4 三晃金属工業 Tokyo//General contractors and subcontractors
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Oct 29, 2025~Nov 25, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. Hybrid Concrete Reinforcement Method "Solid Remain Alpha"
  3. Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  4. 4 Reinforcement of existing beam after hole cutting: "Redouble Method" コンステック
  5. 5 Temporary bridge temporary pier cable-stayed construction method "LIBRA Method" 横山基礎工事

Construction method Product List

2281~2295 item / All 4237 items

Displayed results

Micro Pile Method "SP Micro Pile"

Micro Pile Method "SP Micro Pile"

This is a full-scale high-strength micro-pile construction method that involves double-tube drilling with large-diameter self-drilling bolts and thick-walled steel pipes, ensuring reliable bolt adhesion by extracting the thick-walled steel pipe within the support layer, and placing the thick-walled steel pipe in the upper section. 【Features】 ● Double-tube drilling with self-drilling bolts Great support capacity even with a narrow diameter. (Can accommodate compression, pull-out, and lateral loads) ● Double-tube drilling using self-drilling bolts and thick-walled steel pipes. (Can be handled with conventional anchor machines) ● Construction is possible even in narrow workspaces by selecting the appropriate installation machinery. ● Injection work can be carried out immediately after drilling is completed. (High-speed construction is economical) ● Reduces the time until steel pipe extraction. (Adhesion with the ground occurs, making extraction reliable) ● Easy connection of bolts and steel pipes. ● For other functions and details, please contact us.

  • Steel structure construction
  • Foundation construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Injection-type original design rock bolt method "SP Soil Nail"

It achieves "high speed," "simplicity," and "low cost" compared to the conventional double-tube drilling method.

"SP Soil Nail" achieves "high speed," "simplicity," and "low cost" compared to the conventional double-tube drilling method. Compared to the traditional double-tube method using anchor machines, the components are lightweight, eliminating the need for rod retrieval and core material installation, enabling labor-saving and high-speed construction. The pressurized injection effect of SP Soil Nail has been verified through tests such as "excavation tests." 【Features】 ○ High-speed, labor-saving construction ○ Reliable anchoring achieved through pressurized injection For more details, please contact us or download the catalog.

  • Earth retaining wall/foundation reinforcement
  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Micro-pile construction method "SP Micro-pile method"

Self-drilling bolt for double pipe excavation "SP Micro Pile"

"SP Micro Pile" is a unique micro pile construction method developed based on publicly available research from various countries, including Italy, the United States, and Japan, with a thorough pursuit of improved workability, long-term quality maintenance, and cost-effectiveness. 【Features】 ○ High strength orientation ○ Ministry of Land, Infrastructure, Transport and Tourism NETIS registration number: KK-100036-A For more details, please contact us or download the catalog.

  • Earth retaining wall/foundation reinforcement
  • Earthworks
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Micro-pile construction method "SP Fix Pile Method"

Route pile construction method that achieves high speed, labor saving, and multi-stage hook effect.

The "SP Fix Pile" uses a hollow SP bolt as a center rod and employs a double-tube drilling method with a general-purpose drill pipe, which can also be applied as a micro-pile. Once drilling is completed, injection is performed through the SP bolt, and only the drill pipe is withdrawn, eliminating the need for rod retrieval or core material installation, thus enabling labor-saving and high-speed construction. Although it features a thick bolt structure with a diameter of 115mm or more, stable drilling and reliable shaping through pressurized injection can be achieved with a general-purpose anchor machine up to about 20m, making it effective as a long, thick bolt for countermeasures on slopes with extremely deep soft layers or embankment slopes. Additionally, when adopted as a compression-type pile foundation, placing a "mouth reinforcement pipe" at the head allows for the rational handling of horizontal forces and bending moments in addition to axial compressive forces. 【Features】 - It is a reinforcement soil method that does not introduce tension, eliminating the need for tension management. - Even if over-tension occurs due to seismic loads, there is no issue with tension adjustment. - The SP bolt is used as a center rod for double-tube drilling, leaving it in place, so core material insertion work is unnecessary. - It is a waiting-type reinforcement soil that does not require tensioning work. - The work process can be shortened, achieving high-speed construction. For more details, please contact us or download the catalog.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Micro-pile construction method "SP Mini Pile Method"

Large diameter self-drilling bolt "SP Mini Pile"

Self-drilling bottles are more widely used for their simplicity and speed of operation in reinforcement earthworks such as mountain tunnel auxiliary works and slope stabilization, as well as for their overall economic efficiency and workability in confined spaces. The "SP Mini Pile" is a thick-walled self-drilling system developed by "ST Engineering Co., Ltd." aimed at further expanding the application of the advantages of the self-drilling system into a broader range of fields. 【Components】 ○ SP Fixed Nut ○ SP Coupler ○ SP Bolt ○ SP Bit For more details, please contact us or download the catalog.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Urethane Hollow Filling Method "NTR Method"

A product lineup that can be selected according to conditions, ranging from 10 times expansion to 40 times expansion.

High-expansion polyurethane injection material [NTR Foam] is a product developed for filling cavities behind tunnel walls. Due to its high expansion, it can fill cavities with a small amount, making it very economical. Moreover, it has an extremely low specific gravity, which does not impose a significant load on the tunnel. Additionally, its curing time is very short, making it suitable for projects that require quick construction. 【Features】 ○ Because it is a high-expansion polyurethane, the required material can be reduced by the expansion ratio, making construction simple and lightweight. ○ The short curing time allows for limited injection, and even in the presence of water inflow, the possibility of material separation and outflow is minimal, thus not adversely affecting the water environment. ○ The foamed solid forms a water-insoluble polymer compound with a three-dimensional structure, which is chemically stable and maintains its shape and strength over the long term. ○ Compliant with the "Guidelines for Safety Management of Polyurethane Injection Materials in Mountain Tunnel Construction." ○ A lightweight, compact injection machine that offers good workability and can be used in long and narrow environments. For more details, please contact us or download the catalog.

  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wild boar damage control method "InoSaver" *Free on-site survey available

Unlike fences and barriers, it reduces damage to the areas you want to protect without hindering the intrusion of wild boars!

The Japanese vegetation wild boar damage suppression method "Ino-Saver" features a surface without protrusions, allowing it to be opened up as a plaza. Even when disturbed by wild boars, it cannot be dug up to the roots due to the strong net. Since the roots are protected, the grass can recover even after being disturbed. You can also download PDF materials on construction methods and specifications from the link below! 【Features】 ■ Not dug up to the roots ■ Grass can recover ■ Connected installation of nets *We also conduct free on-site surveys. Please feel free to contact us.

  • inoseiba2.PNG
  • inoseiba3.PNG
  • inoseiba4.PNG
  • Earthworks
  • Pest and insect control products

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rainwater infiltration and foot pressure responsive square greening method "Grasstrong" *Free on-site survey

A structure that secures the root growth layer, preventing compaction from foot traffic! Usable as a lawn area accessible for people and vehicles.

The Japanese vegetation pressure-resistant square greening method "Grasstrong" is suitable for parks and schoolyards. By filling the voids of No. 4 crushed stone with a strong underlayer and sand, the roots of the grass can extend down to the sub-base layer, allowing the grass surface to demonstrate high recovery power even if it is damaged. You can also download PDF materials on construction methods and specifications from the link below! 【Features】 ■ Strong against stress ■ Improved water retention and nutrient retention ■ Strong against pressure ■ High recovery ability *We also conduct free on-site surveys. Please feel free to contact us.

  • gurahutorongu_c1-960x720.jpg
  • gurahutorongu_c2-960x720.jpg
  • gurahutorongu_a1-960x720.jpg
  • Other park materials
  • Wall and rooftop greenery

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ring unit type rockfall prevention method Rope installation "Ring Rope"

Units can be delivered one piece at a time! They can be divided into smaller portions, saving the hassle of cutting ropes.

The "Ring Unit Type Rockfall Prevention Method" is a technique that processes wire ropes into a ring shape and connects multiple units to prevent rockfalls. We offer a lineup of "Ring Rope" for rope laying works and "Ring Cover" for rope covering works. During the sliding of rockfalls, the unit with a connected ring structure disperses stress, preventing excessive load from concentrating on a single wire rope. 【Features】 ■ Excellent transportability of materials ■ Stress is distributed throughout ■ Reduces dangerous work on site *For more details, please download the PDF or feel free to contact us.

  • 4a.PNG
  • 4b.PNG
  • 4c.PNG
  • 4d.PNG
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Tezak Super Lock Method

Three types are available: net type, close-contact type, and G-spec! You can choose according to the site conditions.

The "Tezak Super Lock Method" is a technique that suppresses the initial movement of scattered boulders and loose stones on slopes by utilizing the flexibility of wire ropes and the restraining and supporting forces of anchors. We offer three types: "Tezak Super Lock <Net Type>", "Tezak Super Lock <Close Contact Type>", and "Tezak Super Lock G-spec". This method can be selected from the above three types according to the site conditions. 【Features】 ■ Helps stabilize loose stones scattered over a wide area of the slope ■ Does not compromise the natural landscape ■ Compatible with most terrains ■ Reduces the need for land acquisition for projects *For more details, please download the PDF or feel free to contact us.

  • 5a.PNG
  • 5b.PNG
  • Earth retaining wall/foundation reinforcement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] (Private) Rockfall prevention measures for slope restoration work at temples and shrines.

The soil type is clayey soil, rock masses, and pebbles, with examples of restoration work in a 250m² area!

We would like to introduce a case where our "Tezak Super Lock (G-spec)" was used in the restoration work of the slope at Kinkai Komyoji Temple. This project was commissioned privately and carried out in Kyoto Prefecture. The soil types included clayey soil, rock masses, and cobblestones, covering an area of 250m2 for the restoration work. This method is designed to suppress the initial movement of scattered boulders and floating stones on the slope by utilizing the flexibility of wire ropes and the restraining and supporting power of anchors. [Case Overview] ■ Project Name: Restoration Work of the Slope at Kinkai Komyoji Temple ■ Location: Kyoto Prefecture ■ Construction Date: May 2022 (Year 4 of Reiwa) ■ Area: 250m2 ■ Soil Types: Clayey soil, rock masses, cobblestones *For more details, please refer to the related links or feel free to contact us.

  • 18a.PNG
  • 18b.PNG
  • Rockfall prevention agent

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Andersen Park Dog Run. Measures against stress from feces, urine, and foot pressure.

An example of a construction method that secures a root growth layer and prevents compaction due to foot traffic!

In the 2014 fiscal year, we would like to introduce a case where the pressure-resistant green space greening method "Grass Strong" was implemented at the Andersen Park dog run. This product was chosen because it is resilient to stress from urine and feces, as well as foot traffic. Its safety due to the absence of protrusions on the surface and the ability to prevent excavation with the GS net also make it suitable for dog runs. 【Case Overview】 ■ Project Name: 2014 Andersen Park Dog Run ■ Location: Chiba Prefecture ■ Construction Date: February 2014 ■ Area: 3,100 m² ■ Purpose: Park *For more details, please refer to the related links or feel free to contact us.

  • 19-2.jpg
  • Other park materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Animal Guard Construction Method <Construction Procedure>

Can be used in conjunction with frame construction and vegetation sheet construction! There is also a type for boar prevention.

Our company implements the "Animal Guard Method," which involves installing vegetation mats and sheets tailored to specific locations and situations. After installation, height keepers are placed at regular intervals on top, and the sky cross net is deployed over the installed height keepers. The wire mesh is connected using a dedicated sky coil, ensuring that the sky cross net is maintained at a certain height, completing the installation. 【Installation Steps】 ■ Laying vegetation mats and sheets ■ Installing height keepers ■ Deploying wire mesh ■ Connecting wire mesh ■ Completion of installation *For more details, please download the PDF or feel free to contact us.

  • ?アニマルガード工 画像2.png
  • ?アニマルガード工 画像3.png
  • ?アニマルガード工 画像4.png
  • ?アニマルガード工 画像5.png
  • ?アニマルガード工 画像6.png
  • ?アニマルガード工 画像7.png
  • Planting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wildlife Damage Prevention Method "InnoSaver"

A strong net! The surface is free of protrusions and can be opened up as a square.

"InnoSaber" is a wildlife damage prevention method for grassy areas that, unlike fences or barriers, does not hinder wild boar intrusion while reducing damage to the areas you want to protect. It is made of grass intertwined with a sturdy net, and since the nets are connected during installation, the entire area remains unified and cannot be easily overturned. Even if wild boars dig up the area, the strong net prevents them from uprooting the roots, thereby protecting them, which allows the grass to recover even after being disturbed. 【Features】 ■ Roots are not uprooted ■ Grass can recover ■ Reduces damage to protected areas without hindering wild boar intrusion *For more details, please download the PDF or feel free to contact us.

  • ?イノセイバー 画像2.png
  • ?イノセイバー 画像3.png
  • ?イノセイバー 画像4.png
  • ?イノセイバー 画像5.png
  • Other civil engineering works
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Integrated parking lot greening method "Tafutafu Park" for roadbed layers.

The turf protection material protects the grass from damage caused by vehicle compaction and abrasion!

"Tafutafu Park" is a green parking lot designed to prevent soil compaction from vehicle pressure and to secure a growth layer for roots, maintaining the grass. The grass uses Kyoryokka 21, which demonstrates high effectiveness against the high temperatures and dryness of the parking lot. Additionally, by incorporating a sand cushion layer, it improves drainage and provides a leveling function. 【Features】 ■ Resistant to stress ■ Improved drainage ■ Enhanced water retention and nutrient retention ■ Can be counted towards green space area ■ Strong against compaction *For more details, please download the PDF or feel free to contact us.

  • ?タフタフパーク 画像2.png
  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration