Construction method Product List and Ranking from 1590 Manufacturers, Suppliers and Companies | IPROS

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

  1. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  2. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  3. コンステック Osaka//General contractors and subcontractors
  4. 4 TRAWE main office Saitama//Other construction industries
  5. 5 日本海洋サービス 大阪支店 Osaka//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Mar 18, 2026~Apr 14, 2026
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. 建物外壁工事 ロープアクセス工法 TRAWE main office
  3. Roof insulation and waterproofing renovation method "Rimtect Method" コンステック
  4. 4 Support for bridge pier reinforcement nationwide: "Temporary Closure LPF Method" 日本海洋サービス 大阪支店
  5. 5 Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研

Construction method Product List

3721~3750 item / All 4289 items

Displayed results

Waterway renovation method "Lift-in method"

It can be rehabilitated as a "self-sustaining" waterway with high functionality and durability.

The "Lift-in Method" is a waterway renovation method using Esron® RCP®. By utilizing non-excavation techniques, it allows for rehabilitation while minimizing the impact on the surrounding environment due to the absence of electric machinery. Additionally, it enables rehabilitation without the need to demolish the aging existing waterway. 【Features】 ■ Allows for speedy and labor-saving transportation of Esron RCP ■ Excellent elasticity, flexibility, and water tightness due to the joint structure (rubber ring) ■ Can respond to Level 2 seismic movements by following ground fluctuations due to the flexibility of the pipe body ■ With a small roughness coefficient, it allows for a size reduction of 1 to 2 sizes and a lower slope while maintaining the same flow rate as the existing waterway ■ As it is a product managed according to consistent quality standards and criteria, construction quality management is easy *For more details, please download the PDF or contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos sealant remover "S Sealant II"

For the removal and containment of asbestos! Our company has developed a new chemical agent for asbestos treatment.

"S Sealant II" is an asbestos sealant remover that can be used exclusively for all asbestos removal tasks. With strong penetration and adhesion, the particularly tough and elastic film covers structures containing asbestos without cracking or falling off. Depending on the dilution concentration during use, it can be utilized for both asbestos removal and containment, making inventory management easier. 【Features】 ■ Can be differentiated by changing the dilution ratio with water according to purpose ■ Can be used for multiple purposes with this product alone ■ Strong penetration prevents dust from asbestos-containing buildings by penetrating deep inside ■ Contains no harmful substances, allowing for safe use ■ The film is tough, elastic, and excels in its properties as a containment agent *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pole Repair and Reinforcement Method: YCK Method 'Carbon Fiber'

Repair and reinforcement method for poles using carbon fiber! Achieve extended life for poles with low cost and speedy construction. Applicable to concrete poles as well.

At Yoshimoto Pole, we are implementing the "YCK Method" using thermoplastic carbon fiber material "CFRTP." Utilizing the characteristics of thermoplastics, the sheets are formed into rolls, allowing for an easy method where adhesive is simply applied to the pole and the sheet is attached. This speedy work reduces construction costs and extends the life of the pole until the time for replacement and renewal. Additionally, as a pole manufacturer, we conduct bending strength tests to confirm effectiveness. [Features] ■ Low-cost and speedy response to dangerous aging deterioration ■ Multi-layer structure to stop corrosion ■ Approximately 10 years of life extension effect ■ Quick construction in a short time ■ Ministry of Land, Infrastructure, Transport and Tourism New Technology Information Provision System Registration Number: KT-170077-A *For more details, please refer to the PDF document or feel free to contact us.

  • image_02.png
  • image_03.png
  • image_04.png
  • image_05.png
  • image_06.png
  • image_07.png
  • image_08.png
  • image_09.png
  • image_10.png
  • Special Construction Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SRC Foundation [Heat Storage Floor Method]

A completely sealed structure filled with a gravel layer under the floor achieves a home that combines strength and comfort.

The SRC foundation [heat storage floor method] features a completely sealed structure without space, formed by a rising foundation on the outer perimeter, incorporating flat jigs (H-shaped steel) into the column supports on the inner perimeter, and filling the area beneath the floor with a layer of gravel and concrete. It demonstrates strong ground support against differential settlement and uplift, and through a unique method that minimizes distortion and strain, it achieves high durability, high seismic resistance, and high-quality housing. Furthermore, it completely shuts out cold air and moisture from outside, and the massive heat storage layer beneath the floor provides natural heating and cooling effects that strongly support comfort and energy efficiency. [Features] ■ Natural heating and cooling effects utilizing natural energy (geothermal heat) ■ Improved building quality and durability due to high horizontal precision of the subfloor concrete ■ Gravel layer absorbs and disperses vibrations ■ Suppresses moisture, termites, and decay fungi ■ Sealed structure prevents flooding under the floor ■ Low-cost installation of a heat storage-type hot water floor heating system in all rooms on the first floor is possible The construction of the SRC foundation [heat storage floor method] requires a registration contract with our company. Registered stores will receive various support, including the provision of SRC foundation know-how, exclusive material sales, and technical guidance. Please feel free to contact us for more details.

  • Foundation construction
  • Housing structure technology/long-term superior housing technology
  • Earthquake-resistant construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

吊用タン『A10312』

吊ボルトに吊バンドを取付けるための金具!サイズはW3/8・W1/2

当社で取り扱っている吊用タン『A10312』について ご紹介いたします。 電気亜鉛めっき仕上げを施している吊ボルトに吊バンドを 取付けるための金具です。 ご用命の際はお気軽にお問い合わせください。 【仕様】 ■材料 SPHC ■表面処理 電気亜鉛めっき仕上げ ■サイズ W3/8・W1/2 ■三角法 3RD ANGLE PROJECTION ■尺度 1:1 ※詳しくはPDFをダウンロードしていただくか、お気軽にお問い合わせください。

  • Parts and Materials
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Concrete method for sheet pile revetment "Round Precast"

Landscape revetment products featuring locally sourced natural stones such as pebbles and broken stones arranged in a precast concrete method.

"Round Precast" is a robust revetment method that takes into consideration the landscape and natural environment, similar to precast concrete revetments, and is stronger than other revetment methods. It has been widely adopted in riverbank construction for large rivers and is backed by a wealth of proven results, making it a highly reliable precast concrete revetment product. 【Features】 ■ By specifying your preferred natural stone, it is possible to create a landscape revetment that harmonizes with the local natural environment. ■ Layouts can be customized according to site conditions such as slope length, slope gradient, and curved sections. ■ It demonstrates disaster prevention functions against direct impacts on the revetment from driftwood, rolling stones, and other debris. *For more details, please download the PDF or contact us.

  • Safety and consumables
  • Various blocks
  • Tensioning and connecting blocks
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Prevent excavation accidents! Non-destructive underground "visualization" method for detecting buried pipes.

Deep exploration is now possible! It is compact and lightweight at approximately 15 kg, making it easy to carry with one hand.

Reliable Co., Ltd. utilizes the state-of-the-art ground radar "Utility Scan Smart" to provide rapid and accurate underground pipeline surveys anywhere in the country. With thorough investigations before construction, we minimize the risk of infrastructure cutting accidents and strongly support site safety and adherence to construction schedules. **Three Reasons to Choose Reliable's Surveys** - Clear images for identification (high resolution) - Accurate depth and location (high precision) - Speedy investigations (mobility) *For more details, please download the PDF or feel free to contact us.*

  • Other measuring instruments
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cleaning Method "SJ-V Method"

High-pressure water cleaning method "SJ-V Method"

The "SJ-V Method" is a cleaning technique that uses ultra-high pressure water (80-100 MPa) to spray and clean the surface of pavements with a dedicated cleaning unit. This method of cleaning with ultra-high pressure water is expected to provide various benefits, not only improving aesthetics but also ensuring "safety for pedestrians" and restoring permeability and water retention functions, which can help mitigate the heat island phenomenon and contribute to "environmental improvement." 【Features】 ■ Restoration of permeability and water retention functions of pavements ■ Recovery of slip resistance values ■ Restoration of landscape, removal of attachments such as gum and soil ■ Removal of weeds and moss growing from joints ■ A variety of optional post-cleaning works are also available, etc. *For more details, please download the PDF or contact us.

  • Special Construction Method
  • Paving of sidewalks, roads, parking lots and stadiums
  • Pavement construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Various types of ceiling-mounted brackets for projector frames.

A wide variety of ceiling mount brackets for projector frames are available!

The "Projector Frame Ceiling Mounting Bracket" comes in two types: an attachment type that can be mounted on various projector frames designed by our company, and a type that is directly attached to the bottom surface of the main body. By using aluminum structural materials, we have achieved weight reduction. The attachment type can also be designed for double stack hanging. In addition, we offer a variety of projector-related products, including "VP stands of various types (round pipe type and square pipe type)." 【Features】 ■ Two types: an attachment type that can be mounted on various projector frames and a type that is directly attached to the bottom surface of the main body ■ The attachment type can also be designed for double stack hanging ■ The top part comes in two specifications: one for pipe hanging and one for direct attachment of a hanger (*The pipe hanging specification requires additional extension pipes and flanges) ■ Blocks that allow adjustment of tilt in the front, back, left, and right can be installed (optional for pipe hanging specification only) ■ A specification that allows movement in the front, back, left, and right from the hanging point is also available (optional for pipe hanging specification only) *For more details, please refer to the PDF document or feel free to contact us.

  • プロジェクターフレーム天吊専用金具?.png
  • プロジェクターフレーム天吊専用金具?.png
  • プロジェクターフレーム天吊専用金具?.png
  • プロジェクターフレーム天吊専用金具?.png
  • Other office supplies
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ecological Hybrid Construction Method

An environmentally friendly construction method that does not require much time or cost! It is effective for eco-renovations of warehouses and factories.

The "Ecological Hybrid Construction Method" solves the problems of "cannot be stepped on, cannot be washed, and is expensive to dispose of" all at once, without high-pressure washing, while maintaining strength and waterproofing, and exhibiting heat insulation, thermal insulation, and antibacterial properties. Using an epoxy-based curing resin with exceptional curing speed, "special reinforcement material," we stop leaks in deteriorated slate roofs and restore their strength. By applying the heat-insulating, thermal-insulating, and antibacterial paint "special heat-insulating thermal-insulating paint," we can lower indoor temperatures through insulation and thermal insulation effects. [Features] ■ Can be constructed without washing (without high-pressure washing) ■ Strengthens waterproofing and addresses leaks ■ Enhances strength and prolongs the life of the roof ■ Keeps it cool in summer and warm in winter due to heat insulation and thermal insulation *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Heat insulation and heat shielding methods
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Geotextile Reinforced Soil Wall Method "Adem Wall"

A geotextile-reinforced earth wall method that can withstand harsh weather conditions for a long time!

The "Adem Wall" features a double wall structure composed of an outer wall and an inner wall, utilizing "Adem" and "Grid Belt" as reinforcement materials in a geotextile-reinforced earth wall construction method. By creating a space between the outer wall and the inner wall during construction, the earth pressure resulting from the compression deformation of the fill material does not act on the outer wall. It is possible to sufficiently compact the fill material close to the wall surface, allowing for the construction of high-quality fill. 【Features】 ■ Unique wall structure ■ Excellent basic performance ■ Equipped with advanced technology ■ Outstanding durability *For more details, please download the PDF or feel free to contact us.

  • Reinforced earth wall
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Decomposable Small Pile Driving Method "OTO Method"

A pioneering method for pile driving using a detachable small pile driver, suitable for narrow sites and areas with height restrictions!

Our company utilizes the OTO drilling machine (a dismantlable small pile driver) and conducts the dismantlable small pile driving method known as the "OTO method." We can transport the equipment to the construction site using a monorail, helicopter, or 3.0t truck, and assemble it on-site for construction. This method is applicable in locations where conventional pile drivers (such as Aboron or three-point types) are difficult to transport, such as mountainous areas or narrow sites. 【Features】 ■ All parts can be disassembled to under 3.0t ■ Applicable for construction in locations where conventional machinery is difficult to transport and operate ■ Selection of leader length is possible ■ Selection of drilling method is possible *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Temporary Construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Greening construction spray material "Green Pellet"

Easy to handle in a tablet type, with excellent dispersibility! Dry type sprayable wood fiber.

Green pellets are spray materials for greening construction made from recycled cardboard. The wood fibers contained in cardboard, when used in conjunction with erosion control agents, prevent the loss of seeds and soil, and improve the soil's thermal insulation, water retention, and nutrient retention necessary for plant germination. <Features> 1. Environmentally friendly recycled material This is a recycled material utilizing the increasing amount of cardboard waste in recent years. The wood fibers that serve as the raw material for cardboard decompose after greening is completed, leaving no burden on the environment. 2. High expandability It is a dry type of curing material with low moisture content. After absorbing water, it expands quickly, allowing for a larger area to be covered with a smaller amount compared to wet curing materials. This can reduce transportation costs and labor. 3. Improved workability With a special tablet shape, there is no need to break it apart during material input, making it easy to measure. Additionally, it does not generate dust, preventing the material from scattering and dirtying the seeder or the site.

  • Slope protection material
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Flood damage countermeasures - Fill-type elevation method "Bulk Up Method" NETIS registered

A new method for raising buildings in flood-prone areas significantly shortens construction time compared to existing elevation methods, reduces the amount of work required for house relocation, and has a major impact on costs. Registered in NETIS.

Until now, elevation work in flood-prone areas has involved either moving buildings sideways or lifting them up and raising the ground with fill. When moving a building sideways, proper site preparation can be done, but in places where there is no space to move, site preparation is carried out under the lifted building, making construction difficult and often resulting in insufficient compaction. If water seeps in the future, there remains a risk of building settlement. The "Bulk Up Method" involves lifting the building along with its foundation, leveling it to the required height, and fixing it in place, while filling the space between the foundation and the existing ground with bulk-up material as a substitute for fill. **Features:** - NETIS registration KK-220071-A, recommended by the Ministry of Land, Infrastructure, Transport and Tourism - Since water cannot permeate, the ground does not loosen even if it is submerged. - Its lightweight reduces the burden on the original ground. - Reduces the cost burden of elevation work in house-moving projects. - Can be implemented in narrow spaces. - Shortens construction time. - Reduces damage to the building since it is lifted with the foundation. The bulk-up material is a cement-based filler that expands to 1.5 to 1.7 times its original volume after filling, leaving no voids. After elevating the building, surrounding exterior works and retaining walls can be constructed.

  • Special Construction Method
  • Civil Engineering Method
  • Dismantling and moving
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reinforced Truss Type Discardable Formwork Slab Method "New Ferro DeckⓇ Prototype"

For floor structures under heavy load conditions such as factories and logistics warehouses!

The "New Ferro Deck® Prototype" is a reinforced truss formwork floor system that can be used on floors made of S, RC, SRC, and PCa materials, applicable to slabs with a thickness of 120mm or more. For example, when using the B80 type (upper and lower main bars D13@150) with a slab thickness of 150mm, construction is possible without support up to 3.7m, effectively shortening construction time and reducing the use of tropical hardwood. All products use JIS standard materials, and the corrugated sheets are made of hot-dip galvanized steel plates (Z12), with a working width of 600mm and lengths ranging from 0.6m to 7m. 【Features】 ■ Obtained a construction technology performance certification from the Japan Building Research Institute (GBRC Performance Certificate No. 22-12) for all processes including quality control during factory production, temporary design, slab design, and on-site construction. ■ The main types of horizontal members supporting the slab are S, RC, SRC, and PCa structures. ■ No need for anchoring the lower end main bars of the truss to the beams, and the lower end of the distribution bars has been omitted to obtain certification. ■ The main bars are almost pre-arranged in the direction of reinforcement, reducing on-site reinforcement work and contributing to shorter construction time. ■ As an industrialized product, it provides accurate cover thickness and reliable reinforcement.

  • Formwork material
  • Steel
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

New Feloromat Method (R) "Alcarel (R)"

A work floor that enhances safety and security from deck construction to concrete pouring.

The New Ferro-Mat Method (R) "Alcale (R)" involves arranging reinforcement bars (Alcale) in a narrow spacing that prevents feet from entering (submerging) between the bars, forming a mat-like structure. After laying the New Ferro Deck, these reinforcement bars are arranged to serve as support material for the steel truss of the New Ferro Deck, creating a safe and secure working floor. By unitizing the reinforcement bars, precise and orderly reinforcement work can be performed without disruption. 【Features】 ■ By forming a safe floor on top of the New Ferro Deck, safe and secure walking is possible from the completion of the deck installation to the concrete pouring. ■ By narrowing the spacing of the reinforcement bars, a greater dispersion effect for slab concrete cracking can be expected. ■ The unitization of the reinforcement bars allows for labor-saving in the reinforcement work. *For more details, please download the PDF or feel free to contact us.

  • Formwork material
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Rotary Pile Method "NS Eco Pile(R)"

Rotary pile method applicable as temporary piles!

The "NS Ecopile(R)" is a foundation pile method that involves rotating and pressing steel pipe piles with spiral-shaped steel plates (blades) welded to the tip of the steel pipe. Large diameter piles are driven using a full-circle rotary pile driver, while medium and small diameter piles are driven using self-propelled small pile drivers, allowing the piles to penetrate the ground with the thrust of the tip blades, similar to a wood screw. 【Features】 ■ Environmentally friendly "completely non-discharging method" ■ High vertical bearing capacity and pull-out resistance ■ Pull-out and recovery are possible ■ A wide range of pile diameters and construction machinery options ■ High applicability in narrow spaces, under height restrictions, and near structures (medium and small diameters) *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Steel Pipe Bored Pile Method "TN Method"

A steel pipe middle-boring pile method using a cement milk spraying and mixing technique that is highly efficient in construction and effective for shortening construction periods!

The "TN Method" involves excavating while discharging soil from inside the steel pipe pile using an auger screw inserted into it. After reaching the designated bearing layer, cement milk is injected at high pressure and solidified, using the constructed enlarged bulb at the tip to support the structure with foundation piles. It is widely applicable in both civil engineering and construction fields, and can also be applied to steel sheet pile foundations. 【Features】 ■ High excavation performance, capable of long-length construction ■ Wide applicability with abundant track record ■ Applicable to steel sheet pile foundations ■ High construction efficiency, effective for shortening construction periods *For more details, please download the PDF or feel free to contact us.

  • Ground foundation construction method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Hangzhou Construction Method "CMJ Method"

Effective for shortening construction periods! Concrete pile drilling method using cement milk jet mixing technique.

The "CMJ Method" involves excavating while discharging soil from within the pipe using a screw head inserted inside a concrete pile. After reaching the designated bearing layer, high-pressure cement milk is injected and solidified, supporting the structure with a constructed enlarged bulb. Injected into the supporting ground at a high pressure of over 200 kg/cm². The compressive strength is strong, ranging from 200 to 400 kg/cm². It is widely applied in various fields of construction and civil engineering. 【Features】 ■ Designable pile diameter from 400mm to 1000mm ■ Supported by a large bulb (1.2 to 2.0 times the pile diameter) ■ Broad applicability in civil engineering and construction, with extensive track record ■ High construction efficiency, effective for shortening construction periods ■ Can also be applied as SC piles (with outer steel casing) *For more details, please refer to the PDF materials or feel free to contact us.

  • Pile and foundation work
  • Ground foundation construction method
  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement method for supporting residential buildings with precast concrete piles.

Achieving low cost and high quality through in-house integrated manufacturing and construction of JIS certified prefabricated RC concrete piles with equivalent or greater bearing capacity than steel pipe piles.

The "Ando Pile Method" is a pre-fabricated RC concrete pile driving method for small-scale buildings such as single-family homes and multi-family residences. (Performance Certification Method GBRC Performance Certification No. 10-07 Rev. 5) 【Strengths】 - The piles used are pre-fabricated concrete piles certified by JIS, ensuring stable quality. - The method allows for pile driving to reach the bearing layer reliably, making it possible to work even on organic soil foundations regardless of soil type. - Using a hydraulic low-noise, low-vibration pile driver enables gentle construction in urban areas and densely populated residential areas. - Since pre-fabricated piles are driven without using mixed materials, there is no generation of excess soil. - The method does not require a curing period due to the use of pre-fabricated piles, allowing for excavation to begin the day after installation, contributing to reduced construction time and costs. 【Construction Procedure】 Check for vertical alignment and align the auger head with the pile center. Excavate at a speed that is manageable according to the ground conditions. After reaching the specified depth, normally reverse and lift while maintaining vertical alignment to drive the pile without excessive load. Then, check the vertical alignment of the lower and upper piles, confirm the construction depth, and verify the stopping load. *For more details, please download the PDF or contact us.

  • Ground improvement
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Photosynthesis Efficiency Enhancement Device "Conductor TNCS-5000"

Achieve low costs! Leave it to 'Conductor' for facility horticulture and plant factories!

The "Conductor" is a device that controls CO2 and air application while appropriately using LEDs to supplement illumination (with illumination sensors and time control) to promote photosynthesis. The sensor, rich in input functions, detects waste with a quick sensing speed. It is expected to enhance the growth of new shoots, activate roots, increase yield, and improve quality. 【Features】 ■ Wireless remote environmental integrated control is possible ■ Powered by solar panels ■ Reduction of running costs through CO2 and air application ■ Quality maintenance with LEDs ■ Real-time pH control using CO2 gas, etc. *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Agricultural Cultivation Environmental Data Monitoring System "Sufmart"

You can check agricultural cultivation environment data anytime and anywhere from your smartphone or tablet!

"Sufumart" is a system that uses a wireless network to connect to our products "Breath" and "Conductor," allowing you to check in real-time from your smartphone or tablet anytime and anywhere. It can also calculate the cumulative and average values of each sensor, and if you have the "Breath" or "Conductor" equipped with GPS functionality, it can display the sunrise, sunset, and day length for that location at the current date. Additionally, it is equipped with various alert functions that can detect abnormal sensor display values or control panel anomalies and issue alert warnings. [Features] ■ Easily check the internal environment of the house anytime and anywhere ■ The dedicated app is designed for easy operation, even for those who are not good with PCs ■ Accumulates environmental data within the house, allowing for time-series confirmation through graphs ■ Notifies you via alert email when the set temperature or humidity thresholds are exceeded ■ Easy confirmation of cumulative and average values, etc. *For more details, please download the PDF or feel free to contact us.

  • others
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The carbon shield method is adhered with adhesive to the surface of molded products, etc.

We will finish resin and metal parts with a carbon look! We can easily process curved areas, tapered sections, and more.

This is a processing method that directly adheres real carbon to an object with a certain degree of hardness and finishes it with a clear coat. It is a technology that has mainly been used for automotive interior panels. Since it can be processed from a single point, it is also suitable for producing pre-sample products. It can also accommodate three-dimensional objects (negotiable).

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Dry Shotcrete Method "AF Dry Shot Method"

Dry spray method using alkali-free liquid quick-setting agent Signit L53AF (JP-A)!

Our company offers spraying work using environmentally friendly liquid accelerators, compatible with the dry spraying method "AF Dry Shot Method." Since the accelerator is weakly acidic, it has minimal adverse effects on the human body and improves the working environment underground. Additionally, compared to powder accelerators, replenishing the accelerator tank is easy, and there is no dust generated during replenishment. 【Features】 ■ Dust reduction compared to using powder accelerators ■ No need for admixtures even in high-strength spraying (e.g., C: 450kg/m3) ■ Reduction of rebound compared to using powder accelerators ■ Accurate measurement of the accelerator is possible, ensuring stable quality of sprayed concrete ■ Easy cleaning of hoppers and pipes, with no generation of wash water, etc. (cleaning can be done with high-pressure air only) *For more details, please download the PDF or contact us.

  • Civil Engineering Method
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Specialized in anti-corrosion processing (also confident in painting)

Currently offering a variety of rust prevention treatments (shot blasting, steel shot, etc.).

Multi-functional rust prevention processing (shot blasting, steel shot) and layering are well-regarded. 【Features】 Long-lasting rust prevention performance, heat resistance, chemical resistance, and durability of the coating Quick removal of rust and old paint, resulting in a clean surface that can be reused Compatible with thin plates Blast processing possible in the state of fabricated products Large item processing also available with extensive equipment and a 10-ton crane TEL: 082-232-2445 FAX: 082-293-0286 Contact: Tao Mobile: 090-3742-9768 Email: bousei@harada-tekkou.co.jp Harada Iron Works Hiroshima Official Link

  • Rust Inhibitor
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Processing - Finishing Process Edition

Finishing processing is a method of machining to match the dimensional accuracy specified in design drawings, product specifications, and part specifications.

There are various types of processing. This time, I would like to explain finishing processes. For more details, please refer to the PDF download below. For anything related to blasting and painting, please leave it to us. Harada Ironworks Co., Ltd. TEL: 082-232-2445 FAX: 082-293-0286 Contact: Tao Mobile: 090-3742-9768 Email: bousei@harada-tekkou.co.jp Harada Ironworks Hiroshima Official Link

  • Bridge Materials
  • Tunnel Materials
  • River construction
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Harada Ironworks Hiroshima Official Website Completed

The homepage has been fully launched. We will update it regularly, so please take a look!!!

Our website, which conveys our technology to many customers, has finally been fully launched. We are sharing a wealth of information, including product information and technical details, etc. We will continue to update it daily, so please take a look. You can view it through the link below.

  • Rust Inhibitor
  • Special Construction Method
  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Impact on the durability of the coating / Preparation of the substrate is necessary.

Proper adjustment of the substrate is essential for maintaining the durability and lifespan of the paint.

The lifespan of metal coatings is generally considered to be around 10 to 30 years. The factors that influence this lifespan can be broadly categorized into the following four: Surface Preparation: Proper adjustment of the metal surface before painting is crucial. Cleaning and treating the surface improves the adhesion and durability of the coating. Number of Coats: It is also important to adhere to the appropriate number of coats. Ensuring sufficient coating thickness enhances the corrosion resistance of the metal. Type of Paint: The type of paint used significantly affects the lifespan. It is necessary to select appropriate paint that matches the metal's usage environment, considering factors like weather resistance and chemical resistance. Painting Techniques, Climate, and Surrounding Environment: The skills used in the painting process and the construction environment are also important factors. By employing appropriate painting techniques and considering climate conditions and the surrounding environment, the quality and lifespan of the coating can be improved. By properly managing these elements, the lifespan and corrosion resistance of metal coatings can be maximized. For more details, please refer to the PDF below. Harada Ironworks Hiroshima Official Link

  • Rust Inhibitor
  • Special Construction Method
  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Primer required, prevents peeling.

If you apply topcoat paint without a primer, it will peel off. Compared to products that have both primer and topcoat, those without primer have weaker adhesion to the substrate, making the paint film more prone to peeling.

When comparing products that only have a topcoat without a primer to standard painting products that include a primer, it was found that the products without a primer easily had their paint film peel off. Primer paint has the dual effect of preventing rust and strongly adhering to the substrate and base material, so it cannot be omitted. Although the primer is not visible, it plays an important role in maintaining corrosion resistance. Additionally, if the primer is not applied properly, the topcoat may be applied unevenly or show inconsistencies, resulting in an unattractive finish. Furthermore, the primer enhances the permeability of the paint, allowing the topcoat to adhere better, which can improve the durability and anti-corrosive properties of the paint film. In other words, the primer is a crucial step that significantly affects not only the appearance but also the performance and lifespan of the paint. Therefore, omitting the primer greatly increases the likelihood of having a paint job that peels easily or products that are prone to rust, making it essential to always apply an appropriate primer.

  • Rust Inhibitor
  • Special Construction Method
  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The relationship between blasting and painting.

In painting, proper surface preparation (substrate treatment) is essential to achieve a good finish. The most effective method for surface preparation is blast treatment.

"Surface preparation" refers to the process of preparing the underlying material or substrate. Metals are melted, cooled, and solidified during the manufacturing process, but when exposed to high temperatures, they combine with oxygen in the atmosphere to form a film known as an oxide layer. If painting is done without removing this oxide layer and impurities, contaminants will mix between the paint and the substrate, leading to poor adhesion. Additionally, the functionality of the paint will not be realized due to the influence of impurities, preventing it from performing as intended. However, by using blasting to prepare the substrate, the surface oxide layer, rust, and other contaminants can be completely removed. Furthermore, by using angular abrasives, countless fine irregularities are created on the substrate, increasing the surface area for paint adhesion and preventing peeling. By cleaning and preparing the substrate with blasting before painting, the lifespan of the paint film can be extended two to three times, providing long-term economic benefits.

  • Rust Inhibitor
  • Special Construction Method
  • paint
  • Construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration