List of Construction, work and methods products
- classification:Construction, work and methods
6976~7020 item / All 28356 items
100% recycled gypsum derived from waste gypsum boards is reused as raw material, achieving effective carbon neutrality during manufacturing!
- Gypsum board and moldings
Developing equipment and technology for air conditioning, water supply and drainage, and kitchen drainage!
- Air conditioning equipment
- Water Treatment Plant
- Water supply facilities
We will introduce construction examples such as filling abandoned pits using eco-mortar that combines non-shrink mortar and fluidized treated soil with air.
- Mortar and plaster materials
- Other civil engineering works
A water-stopping method that helps shorten construction periods and reduce areas affected by water outages!
- Special Construction Method
- Renovation and repair methods
- Piping Equipment
Introducing construction examples of mortar filling for long pipelines such as water supply, sewage, and gas lines.
- Mortar and plaster materials
- Other civil engineering works
We will introduce construction examples such as the filling of lifeline pipes using low heat generation and highly breathable air mortar.
- Mortar and plaster materials
- Other civil engineering works
Corrected a maximum settlement of 46mm! A case that resolved the distortion of the door frame caused by settlement.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
A case study of correcting liquefied ground due to the earthquake! Maximum settlement of about 60mm was corrected in a day and a half.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum settlement of 500mm occurred! A case where the up-con method and single pipe pile driving method were used in combination for correction.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Possible to carry out construction without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Even if the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Renovation and repair methods
- Ground foundation construction method
- Road construction
An example of quickly correcting the unevenness in the concrete pavement slab of a highway toll booth!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Performed correction of the toll booth subsidence! Partial corrections were also carried out in areas where there was a step difference with the U-shaped drainage ditch.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Conducted resin injection work while managing levels! A case completed in 4 days.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Repairing the apron step and gaps without removing the apron! A case where our method was adopted.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Correction of road surface irregularities in a short construction period! Introducing examples of port facility repair work.
- Renovation and repair methods
- Harbor Construction
- Ground foundation construction method
Maximum settlement of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
The ground floor slab has sunk due to the earthquake! A case study of improvements made to the gaps between the floor and walls, and between the walls and ceiling.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Our method, which raises the CO pavement slab using the foaming pressure of rigid urethane resin, has been adopted!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Settlement correction while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
We will propose the optimal smoking room based on the installation location, building structure, and customer requests.
- Interior construction
A time when two robots can choose appropriate actions and work while conversing with each other through AI!
- Interior construction
Able to communicate and collaborate! Achieving high-precision work.
- Interior construction
Anchor bolt diameter M12 and compatible with M52 to M80! Base plate oversized hole filling material.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever had trouble with misalignment of anchor bolts? *Sample available.
- Steel construction
Avoid performance-related issues such as re-leveling of the platform and re-drilling of the base plate holes that have been carried out in some areas until now! *Sample available upon request.
- Steel construction
Avoid performance-related issues such as the previously conducted adjustments to the table and re-drilling of holes in the base plate! *Sample available for provision.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever experienced trouble due to misalignment of anchor bolts? *Sample available.
- Steel construction
Compatible with anchor bolt diameters M12 and M52 to M80! Base plate oversized hole filling material.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
Avoid performance-related issues such as the previously conducted adjustments to the platform and re-drilling of base plate holes! *Sample available upon request.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever had trouble with misaligned anchor bolts? *Sample available.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
Anchor bolt diameter M12 and M52 to M80 compatible! Base plate oversized hole filling material.
- Steel construction
Avoid performance-related issues such as re-leveling and re-drilling holes in base plates that have been carried out in some areas until now! *Sample available upon request.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever had trouble with misalignment of anchor bolts? *Sample available.
- Steel construction
Anchor bolt diameter M12 and M52 to M80 compatible! Base plate oversized hole filling material.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction