List of Bridge Construction products

  • classification:Bridge Construction

1~15 item / All 559 items

Displayed results

Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
株式会社吉光組.png

The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.

The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.

Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...

  • Water Treatment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduce industrial waste! Achieve a sustainable infrastructure maintenance cycle.

  • 2022-06-07_09h31_11.png
  • 2022-06-07_09h31_14.png
  • 2022-06-07_09h31_20.png
  • 2022-06-07_09h31_26.png
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2022-10-18 144819.png

★New Catalog★ Circulating Hybrid Blast System ~An environmentally friendly construction method~

The "Circulating Hybrid Blast System Method" is an environmentally friendly technique that significantly reduces industrial waste and CO2 emissions by circulating and repeatedly projecting abrasive materials. Additionally, by using steel grit as the abrasive material, it efficiently removes coatings that contain harmful substances such as lead, PCBs, and chromium. The catalog has been completed, so please take a look.

Measurement technology capable of obtaining coordinates from any angle, 360 degrees, for shape management.

  • Bridge Construction
  • Steel structure construction
  • Tunnel construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Don't overlook insufficient concrete filling and compaction! A sheet-type sensor (Juuten Mieruka) that visualizes the concrete filling condition and compaction level.

  • システム構成.JPG
  • IPROS01774528239091585514.jpeg
  • Tunnel construction
  • Foundation construction
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
IMG_0460-2.jpg

The 3rd Bridge and Tunnel Technology Exhibition is currently being held!

The 3rd Bridge and Tunnel Technology Exhibition at Makuhari Messe is thriving thanks to your support! It's great to hear directly from visitors who wanted to see the Juutenmieruka in person. We will be exhibiting until 5 PM today, the 29th. We look forward to seeing you at Booth I-23 in Hall 6!

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
シスメット様_インタビュー (1)-9-10_page-0001.jpg

[ZEROSAI Introduction Interview] Akita Prefecture, Japan PS Co., Ltd. Preventing delays in the important process of concrete pouring with pinpoint weather forecasts two weeks in advance.

Issues - Since there is only one ready-mixed concrete manufacturer, it is difficult to change the procurement schedule immediately, and we must make decisions on changing the concrete pouring process early. - When the client requested weather information, we had to retrieve past data from the Japan Meteorological Agency, but often being far from the site made it difficult to determine which information was accurate. Implementation Points - We will proceed with site work leading up to the concrete pouring date, and since forecasts can be viewed two weeks in advance, we can implement measures early. - We can retain weather information that is relevant to the site. Implementation Results *For more details, please refer to the PDF document or feel free to contact us.

We contribute to disaster prevention, mitigation, and national resilience through bridge and seismic reinforcement construction!

  • 橋梁・耐震補強事業部2.png
  • 橋梁・耐震補強事業部3.png
  • 橋梁・耐震補強事業部4.png
  • 橋梁・耐震補強事業部5.png
  • 橋梁・耐震補強事業部6.png
  • Bridge Construction
  • Earthquake-resistant construction method
  • Pile and foundation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

● Significant weight reduction compared to concrete coverings ● Contributes to shorter construction periods and improved workability ● Impact dispersion structure reduces damage to the floor slab

  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

This is an inspection robot designed to obtain inspection image data on behalf of technicians in areas where visual inspection by technicians is impossible!

  • ?橋梁床版下面の点検ワイヤロボットの開発 画像2.png
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Reduction of the number of piles due to the long span girder construction! Temporary bridge and temporary pier construction using a 20m span unified erection method.

  • CIMG5084.JPG
  • 20m支間一括架設方式の仮橋仮桟橋工 L桟橋工法3.png
  • 20m支間一括架設方式の仮橋仮桟橋工 L桟橋工法4.png
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

This is a precast formwork that significantly improves the durability and crack distribution of structures!

  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

It is widely used in general embankments, retaining walls, coastal areas, reservoir banks, and bridge abutments!

  • Bridge Construction
  • Reinforced earth wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

To implement safe and appropriate asbestos measures.

  • Dismantling and moving
  • Bridge Construction
  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Recommended for asbestos removal, bridge construction, facility demolition, etc.!

  • Dismantling and moving
  • Bridge Construction
  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A site with no obstructions nearby, where strong winds and sudden heavy rain are a concern; sharing information along with digital signage.

  • Other civil engineering works
  • Bridge Construction
  • Weather Survey

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
上部工.png

【ZEROSAI Introduction Case】 Prefectural Government 〇〇 Bridge Superstructure Construction Site Concerned about strong winds and sudden heavy rain with no obstructions nearby. Sharing information in conjunction with digital signage. Utilizing ICT to achieve weather DX!

We will introduce a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There are no barriers around the site, so strong wind measures must be implemented with a sense of urgency during work. - Accurate judgment of work feasibility is necessary for effective project management. - We also want to enhance the image among local residents. 【Operations to Solve Challenges】 For more details, please download the PDF.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We will carry out piping design for open-cut and non-open-cut construction using steel pipes, as well as water pipe bridge design.

  • 2-02_PIP2.png
  • 2-03_鉄管1.png
  • 2-05_水管橋1.png
  • 2-06_水管橋2.png
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Filter

classification
Delivery Time
Location