List of Civil Engineering products
- classification:Civil Engineering
1081~1125 item / All 7976 items
Introducing examples of handrail production that ensures safety with appropriate costs and short delivery times!
- handrail
Clear visibility with transparent glass! Recommended for store and building entrances.
- Disaster prevention fittings
- Entrance/Exterior Doors
This is a complete manual packed with professional know-how that makes it easy to understand how to proceed with an office relocation!
- Dismantling and moving
A super-large demolition machine capable of using crushers up to 19 tons!
- Dismantling and moving
Non-decaying, colorfast recycled reclaimed wood.
- Airport facilities
From Tohoku to Okinawa. A collection of construction case studies from across the country as a gift! Enjoy the scenery as a photo book as well.
- Pipeline Construction
Waste Storage Location Sign
- Sewerage facilities
- Civil Engineering Company
- Construction company
Even in areas with poor radio conditions, operations are conducted in a LAN environment as a countermeasure against heavy rain and sudden downpours.
- Erosion control works
We fully support your renovation! Consultations and estimates are free.
- Renovation
- Plastering and painting work
- Dismantling and moving
Non-prism distance measurement up to 500M. A standard model with enhanced features.
- Road construction
Quick and flexible responses to solve internal issues! Feel free to request anything regarding bulk or single tasks.
- Dismantling and moving
NETIS Registered Product: KT-230043-A Measurement Data Cloud Collection Management System
- Other earthworks, foundation works, and exterior floors
We will introduce the construction of the well side with a diameter of 1500mm, height of 1000mm, and thickness of 125mm!
- Other earthworks, foundation works, and exterior floors
Product examples from the new construction of a junior high school! Compatible with any dimensions and hole shapes.
- Foundation construction
A company that doesn't say it can't be done! Kawamoto Concrete will assist you.
- Foundation construction
Well side with dimensions Φ1000×H1000 and thickness 85! Delivery combined to Hyogo Prefecture.
- Other earthworks, foundation works, and exterior floors
We will create it according to the necessary dimensions and the required form you specify!
- Residential foundations
An example of installing debris guards on orifice chambers and entry prevention grates on junction chambers!
- Other earthworks, foundation works, and exterior floors
The size is 450×450×H600/666! Introducing examples of sloped basins.
- Other earthworks, foundation works, and exterior floors
An example of a special foundation block with holes drilled at an angle for installation on a slope!
- Fences, screens, and partitions
- Foundation construction
Introducing the well side with a diameter of 1500mm and height of 1000mm, and a well cover for diameter 1500mm with a thickness of 125mm!
- Other earthworks, foundation works, and exterior floors
A case of shipping foundation blocks 600□×H800, Φ318 for disaster response measures!
- Earth retaining wall/foundation reinforcement
Unloading starts at 11 PM! A speedy installation case completed in 30 minutes.
- Earth retaining wall/foundation reinforcement
It is a shear reinforcement method using post-installed plate-type shear reinforcement bars.
- Bridge Construction
We have embedded SUS bolts in the foundation! A manufacturing case in Yokohama City.
- Foundation construction
It is also possible to divide by weight according to the on-site application! The custom-made factory will assist you.
- Other earthworks, foundation works, and exterior floors
Anchor bolt positions, FEP pipe specifications, number and positions, etc.! Manufactured to fit the site.
- Earth retaining wall/foundation reinforcement
For the protection of embankments and slope stabilization! A retaining wall that combines the effects of soil retention and drainage.
- Dam construction
We prioritize our efforts towards the environment and proposals to our customers, promoting reuse and recycling.
- Waste treatment facilities
- Waste treatment facility
Loosening prevention feature + disc spring + loosening prevention nut for improved work efficiency.
- Other civil engineering works
The industry's first image-up sign creation site. Choose a design and simply "enter text" to complete your construction sign! It's easy and quick to use!
- River construction
- Tile work
- Sign construction
You can choose between headband type and sideband type! It uses a woven elastic belt.
- Sewerage facilities
Maintain the correct posture and support your waist! It is used in various scenes such as transportation, civil engineering, and lathes.
- Earthworks
No underground obstacles will be left behind due to abandonment (entombment)! The 'GEOTETS method' is effective in such areas.
- Ground foundation construction method
- Civil Engineering Method
- Earth retaining wall/foundation reinforcement
A technology that allows for the safe extraction of steel sheet piles even in locations close to railways: "GEOTETS Method."
The "GEOTETS Method" is a construction technique that allows for simultaneous filling while pulling out from pre-installed filling pipes into the voids created by the extraction process. It highly suppresses ground displacement, enabling safe extraction of retaining materials. In recent years, due to the frequent occurrence of major disasters caused by heavy rain, this method has seen an increase in usage as a countermeasure that does not create water channels in retaining works for rivers and reservoir embankments, and it can also be implemented underwater. In soil contamination countermeasure projects, a two-year groundwater monitoring period is required after the completion of the work, which prevents the extraction of retaining materials. By adopting this method, which has the function of a waterproof wall, retaining materials can be removed early, leading to cost reductions. Additionally, we will be exhibiting at the "Sewerage Exhibition '21 Osaka" to be held at Intex Osaka from August 17 (Tuesday) to August 20 (Friday), 2021. We sincerely look forward to your visit.
The recycled and reused steel sheet piles exceed 86,000 tons. It is a construction method that prevents loosening of the surrounding ground when extracting steel sheet piles!
- Ground foundation construction method
- Civil Engineering Method
- Earth retaining wall/foundation reinforcement
[CSPI-EXPO Construction and Surveying Productivity Improvement Exhibition] Visual RTK GNSS receiver equipped with two cameras!
- Road construction
It is high strength, lightweight, and has excellent workability.
- Harbor Construction
<Multi-purpose GRC board> <Stair riser residual formwork specification> This residual formwork is ideal for on-site stair construction in steep areas where heavy machinery cannot enter.
- Dam construction
The Shiakotta High Base Method is a product capable of handling large shear forces that could not be addressed by previous high base methods.
- Foundation construction
Standardization of high shear strength high base - We have started selling the 'Shear Cutter High Base Method'.
Senkushia Co., Ltd. (Headquarters: Minato-ku, Tokyo, Representative Executive Officer and President: Nobuyasu Kasahara), which manufactures and sells construction machinery and chains, as well as related construction work, has recently started selling the "Shear Cutter High Base Method," which has high shear resistance. In our flagship product, the "High Base Method," there has been an issue where, in the design of factories and warehouses, cases where braces are attached to columns resulted in insufficient shear resistance depending on the conditions. We have been working to address this issue. As a result, with this product, even in cases where braces are attached to columns, it has become possible to transmit the shear force from the braces acting on the base plate to the foundation by adopting the "Shear Cutter High Base Method."
Strongly adheres to the contact surface of concrete and steel, which is prone to corrosion, cracking, and dirt! Excellent workability contributes to cost savings on materials. *NETIS registered produc...
- Other earthworks, foundation works, and exterior floors
Introducing the technology that creates a "bridge" to the future, developed through numerous big projects!
- Bridge Construction
Acquisition of ISO 9001 certification (Scope of registration: Design, manufacturing, and erection of steel bridges)! Let me introduce our headquarters factory.
- Bridge Construction
Utilizing comprehensive capabilities for production management and quality assurance! We pursue quality improvement and homogenization from design to manufacturing.
- Bridge Construction
We will introduce construction examples by Takigami Industries from various locations across the country, overseas, and other regions!
- Bridge Construction