List of Construction, work and methods products
- classification:Construction, work and methods
5131~5175 item / All 27319 items
Introducing examples of handrail production that ensures safety with appropriate costs and short delivery times!
- handrail
Clear visibility with transparent glass! Recommended for store and building entrances.
- Disaster prevention fittings
- Entrance/Exterior Doors
Adapter package set of "DST 360" and "TRI120" ◎ Stored in a robust case that can withstand immersion (for a certain period)!!
- Bridge Construction
By using it in combination with the new adapter "DST 360," you can easily measure the distance between any two points (distant locations)!
- Bridge Construction
IP65 specification for use in harsh environments! It is the highest level of rating among the DISTO series of laser distance meters.
- Bridge Construction
Refresh deteriorated concrete structures! Prevent the intrusion of water and carbon dioxide.
- Renovation and repair methods
【Easy to carry】Set of laser rangefinder, tripod + adapter◎ Let's note the measurement results with a convenient application!!
- Work tools
- Other civil engineering works
- Architectural design office
In addition to office buildings, we carry out insulation and soundproofing work in hospitals, welfare facilities, public facilities, factories, etc., minimizing heat loss through various construction ...
- Insulation work
Can be constructed without removing the existing roof! Suitable for large-scale roof renovations in factories and similar facilities.
- Renovation and repair methods
We propose equipment that is excellent in resource and energy-saving effects, environmentally friendly, efficient, and economical!
- Insulation work
Focusing on plumbing and sanitation work, we consider the scale and purpose of each facility, as well as the characteristics of the buildings, to ensure a safe water supply and hygienic drainage!
- Insulation work
A system for supplying explosion-proof paint, the "Syringe Pump System," that simultaneously solves quality, cost, and environmental issues is now available for individual sale.
- Plastering and painting work
- paint
Start of standalone sales for the paint supply device "Syringe Pump System".
The explosion-proof paint precision metering supply device "Syringe Pump System," developed specifically for painting, has started individual sales in response to customer requests. We have met the demands for Takubo's syringe pump. The Syringe Pump System allows for precise control of paint in 1cc increments, enabling numerical management and reducing unnecessary paint consumption. This paint supply device is standard equipment on Takubo's robots. There are two types: a circulation type and a one-cup type. Gun tip control (CC-LINK) is available as an option, subject to consultation. It can be integrated into existing painting robot systems. For more details, please contact Takubo Engineering Co., Ltd. Sales Engineering Department at 0475-50-0211 or visit the Takubo website at https://www.takubo.co.jp/contact/ for inquiries.
Vertical compression reduction packaging machine 4ton (inlet W500×H350mm) with standard drainage holes / Model number M133VRP-5035W
- Air compressors, blowers and pumps
Introducing examples of specialized construction projects that are currently trending, such as hydropower plants and retaining wall repair work.
- Mortar and plaster materials
- Other civil engineering works
We will introduce construction examples such as filling abandoned pits using eco-mortar that combines non-shrink mortar and fluidized treated soil with air.
- Mortar and plaster materials
- Other civil engineering works
A water-stopping method that helps shorten construction periods and reduce areas affected by water outages!
- Special Construction Method
- Renovation and repair methods
- Piping Equipment
Introducing construction examples of mortar filling for long pipelines such as water supply, sewage, and gas lines.
- Mortar and plaster materials
- Other civil engineering works
We will introduce construction examples such as the filling of lifeline pipes using low heat generation and highly breathable air mortar.
- Mortar and plaster materials
- Other civil engineering works
We have compiled useful information from past issues of "Compass PLUS" into an easy-to-read guidebook.
- River construction
Corrected a maximum settlement of 46mm! A case that resolved the distortion of the door frame caused by settlement.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
A case study of correcting liquefied ground due to the earthquake! Maximum settlement of about 60mm was corrected in a day and a half.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum settlement of 500mm occurred! A case where the up-con method and single pipe pile driving method were used in combination for correction.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Possible to carry out construction without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Even if the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Renovation and repair methods
- Ground foundation construction method
- Road construction
An example of quickly correcting the unevenness in the concrete pavement slab of a highway toll booth!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Performed correction of the toll booth subsidence! Partial corrections were also carried out in areas where there was a step difference with the U-shaped drainage ditch.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Conducted resin injection work while managing levels! A case completed in 4 days.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Repairing the apron step and gaps without removing the apron! A case where our method was adopted.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Correction of road surface irregularities in a short construction period! Introducing examples of port facility repair work.
- Renovation and repair methods
- Harbor Construction
- Ground foundation construction method
Maximum settlement of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
The ground floor slab has sunk due to the earthquake! A case study of improvements made to the gaps between the floor and walls, and between the walls and ceiling.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Our method, which raises the CO pavement slab using the foaming pressure of rigid urethane resin, has been adopted!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Settlement correction while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
We will propose the optimal smoking room based on the installation location, building structure, and customer requests.
- Interior construction
A time when two robots can choose appropriate actions and work while conversing with each other through AI!
- Interior construction
Able to communicate and collaborate! Achieving high-precision work.
- Interior construction
Anchor bolt diameter M12 and compatible with M52 to M80! Base plate oversized hole filling material.
- Steel construction