List of Construction, work and methods products
- classification:Construction, work and methods
1666~1710 item / All 28353 items
100% recycled gypsum derived from waste gypsum boards is reused as raw material, achieving effective carbon neutrality during manufacturing!
- Gypsum board and moldings
Developing equipment and technology for air conditioning, water supply and drainage, and kitchen drainage!
- Air conditioning equipment
- Water Treatment Plant
- Water supply facilities
Prevents collisions with glass surfaces and supports safe customer guidance.
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Protect the safety of exhibits! Glass surface collision prevention mark
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Prevent collisions with glass surfaces and create a safe and comfortable space.
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Prevent collisions with the glass surfaces at busy train stations!
- Glass construction
- Entrance/Exterior Doors
- Sign construction
For airport safety measures! Highly visible marks to prevent collisions with glass surfaces.
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Prevent collisions with glass surfaces and improve work efficiency!
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Prevent collisions with glass surfaces and create a safe warehouse environment.
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Prevent collisions with glass surfaces and improve the safety of the experimental environment.
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Protecting the safety of the audience! Preventing collisions with glass surfaces.
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Prevent collisions with glass surfaces and enhance office safety.
- Glass construction
- Entrance/Exterior Doors
- Sign construction
Easy! Safe! Speedy! Supporting the efficiency of civil engineering work.
- Water Supply Facilities
- Scaffolding and Support Materials
- Earth retaining support
Easy! Safe! Speedy! Gear jacks that innovate earth retaining work.
- Water Supply Facilities
- Scaffolding and Support Materials
- Earth retaining support
Minimize damage during collisions! Shock-absorbing protective material that also accommodates curves.
- Other earthworks, foundation works, and exterior floors
Avoid performance-related issues such as re-leveling and re-drilling holes in base plates that have been carried out in some areas until now! *Sample available upon request.
- Steel construction
- Special Construction Method
- Structural Design Office
To eliminate the misalignment of anchor bolts. Absorbs installation errors with two fillers. Compatible from 0mm eccentricity.
- Paving Materials
- Special Construction Method
Avoiding the adjustment of anchor bolt bases and the enlargement of base plate holes to shorten the construction period!
- Steel construction
- Special Construction Method
- Structural Design Office
Introducing a soil improvement agent that instantly enhances the 'mud' generated from construction sites, enabling immediate removal by dump trucks! *Free samples available.
- Renovation and repair methods
- Ground improvement materials
Notice of Year-End and New Year Holiday Closure and Shipping Schedule
We would like to inform you about our year-end and New Year holidays and the shipping schedule for the MT series as follows. During the year-end and New Year period, there may be a concentration of cargo, and we may not be able to deliver on the usual schedule. We kindly ask customers who wish to place orders to do so as early as possible. ■ Our holiday period From December 27 (Saturday) to January 4 (Sunday) * Inquiries received during the holiday will be addressed sequentially after January 5. ■ Final shipping dates for delivery by the end of the year (by December 26) Hokkaido: December 19 (Friday) * For the eastern Hokkaido area, please inquire separately. Tohoku region: December 24 (Wednesday) Kanto region: December 24 (Wednesday) Hokuriku region: December 23 (Tuesday) Chubu region: December 23 (Tuesday) Kinki region: December 23 (Tuesday) Chugoku region: December 23 (Tuesday) Shikoku region: December 23 (Tuesday) Kyushu region: December 19 (Friday) Okinawa region: December 17 (Wednesday) * For remote islands, please inquire separately. * For deliveries at the beginning of the year, please inquire separately. ■ Shipping start date Shipping will begin sequentially from January 5 (Monday).
Strengthen team collaboration! Clear audio for precise instructions.
- Unit and other construction
- others
Supports smooth customer service with clear audio.
- Unit and other construction
- others
Supports remote classes with clear audio. IP67 waterproof and dustproof.
- Unit and other construction
- others
Simply apply it to reduce heat dissipation and cut energy costs. Easily upgrade equipment efficiency!!
- paint
- Heat insulation and heat shielding methods
- Insulation work
Smooth in-hospital communication with clear audio. IP67 waterproof.
- Unit and other construction
- others
Supports operation management with high output of 5W and waterproof performance.
- Unit and other construction
- others
Efficient inventory management in the warehouse with high output of 5W and clear audio.
- Unit and other construction
- others
High output of 5W × IP67 waterproof. A radio device that facilitates hotel operations smoothly.
- Unit and other construction
- others
With 5W high output and IP67 waterproofing, events can be operated smoothly.
- Unit and other construction
- others
Enhancing collaboration at security sites with high output of 5W and IP67 waterproofing.
- Unit and other construction
- others
Supports communication of instructions at construction sites with 5W high output and IP67 waterproofing.
- Unit and other construction
- others
Polishing processing of cutting surfaces that contributes to hygiene management in food machinery.
- Processing Technology
- Glass construction
- Store display shelves
Integration of climbing work scaffolding and the large wall formwork system VARIO for construction!
- Systems Architecture
Integration of climbing work scaffolding and the large wall formwork system VARIO for construction!
- Systems Architecture
【Product News】PERI climbing systems 'SCS', 'RCS', 'ACS', and 'CB' are used at construction sites around the world.
The PERI climbing systems 'SCS', 'RCS', 'ACS', and 'CB' are utilized at various construction sites. The climbing systems, which are one of PERI's product groups, are used at construction sites around the world. These systems integrate working scaffolding and formwork systems to achieve 'improved formwork work efficiency', 'significant reduction in workforce', 'ensured accuracy in formwork construction', 'reduction of scaffolding materials', and 'safety in the work area'. There are two types of climbing methods: one that uses cranes and another that uses a movable hydraulic device instead of a crane, allowing for the selection of the optimal method based on the construction content. **For more details, please check the related products. We also hold 'product assembly experiences' and 'system formwork study sessions' at our stockyard, so please feel free to contact us.** PERI Japan Co., Ltd.
Construction kit system for various works requiring self-elevating technology.
- Systems Architecture
A construction kit system for various projects requiring self-elevating technology.
- Systems Architecture
An article about the construction of the Tamkang Bridge (Taiwan) was published in the Daily Timber Newspaper on March 4, 2026!
An article about the construction of the Tamkang Bridge in Taiwan was published in the "Daily Timber Newspaper" on March 4, 2026! The main tower of the Tamkang Bridge will reach a height of 200 meters above the water surface. According to the plan, the main tower will be constructed in 53 floors, with each floor featuring a complex variation in shape. To achieve the construction of this complex-shaped structure, the Perry System (SCS+VARIO and ACS+VARIO) was utilized. This project is an all-Perry initiative, having been awarded with the support of the Perry Group's project and technical teams through Perry Japan as the point of contact. In this issue, a reporter from the "Daily Timber Newspaper" conducted on-site interviews at the Tamkang Bridge construction site and with representatives from the construction company (KSECO), resulting in an article that touches on topics such as "wooden formwork" and other timber-related subjects. Please be sure to check out the "Daily Timber Newspaper" on March 4, 2026. Perry Japan Co., Ltd.
Construction kit system for various projects requiring self-elevating technology.
- Systems Architecture
Construction kit system for various works requiring self-elevating technology.
- Systems Architecture
The homepage (project) has been updated with additional photos of the construction site (Tōkai Bridge) as of mid-August 2025.
We have added site photos of the Danjiang Bridge, currently under construction in Tamsui District, New Taipei City, Taiwan (taken on August 19, 2025), to our company website (Projects). The main tower will reach a height of 200 meters above the water surface. According to the plan, the main tower will be constructed in 53 floors, with each floor featuring a complex variation in shape. As of the end of August 2025, the construction of up to the 52nd floor has been completed. The construction of the main tower has now entered its final stage. Please check our company website (Projects) for more information. ■ Project Name: "Danjiang Bridge Project" If completed, the Danjiang Bridge, designed by the late Zaha Hadid, will be the longest single-tower, asymmetrical cable-stayed bridge in the world. The construction of this reinforced concrete main tower utilizes the Perry System (SCS+VARIO and ACS+VARIO). Additionally, this project has been awarded as an all-Perry project, receiving support from the Perry Group's project and technical teams through Perry Japan as the point of contact. Perry Japan Co., Ltd.
Easy lock type (wedge type) support system! Assembly is simple and safe. Furthermore, it also improves work efficiency on site.
- Temporary Construction
Easy lock-type (wedge-type) support system! Assembly is simple and safe. Furthermore, it also improves work efficiency on site.
- Temporary Construction
PERI products are used on construction sites around the world. (Denmark: Lighthouse 2.0)
PERI products are used on construction sites around the world. This time, we would like to introduce the construction site 'Lighthouse 2.0' in Aarhus, Denmark. Lighthouse 2.0 is a mixed-use project that includes the high-rise building "Arhus Φ," which is 44 stories tall (142m) and constructed in Aarhus, Denmark. "Arhus Φ" has become the tallest residential building constructed in Denmark. It is located within a 2 km radius of the Aarhus Cathedral in the city center, boasting an excellent location overlooking Aarhus Bay. It was also selected as the best building in the category of Best Tall Building 100–199 Meters at the 2023 CTBUH Awards. PERI products were used in the construction of this building. PERI products: 1. ACS Climbing System 2. PERI UP 3. RCS-P (RCS External Climbing), among others *For more details, please refer to the PDF document or feel free to contact us.
Powerful! Support material for formwork and precast!
- Concrete construction
Powerful! Support material for formwork and precast!
- Concrete construction
Powerful! Support material for formwork and precast!
- Concrete construction
【Product News】Push-Pull Support for Formwork and Precast 'Push Pull Prop' - Powerful! Support material for formwork and precast!
"Push (Press) - Pull (Pull) - Prop (Support Material)" is a push-pull support material that adjusts the alignment of formwork and precast formwork. Reflecting customer feedback, it has been improved to allow for easier length adjustments compared to conventional products. Additionally, it has been made easy to install on precast elements using dedicated components. Compared to conventional products, the handle part has been made easier to grip, and the finish has been changed from paint to plating. As a result, it can be used for a long time as a rental item. 【Features】 ■ Quick length adjustment using a slide pipe function (supports formwork heights up to 14m) ■ Safe and speedy installation on precast columns and walls **For more details, please check related products. We also hold "Product Assembly Experience" and "System Formwork Study Sessions" at our stockyard, so please feel free to contact us. Perry Japan Co., Ltd.
It is a high-durability, lightweight, simple, and easy-to-handle resin formwork system! <NETIS Registration Number: KT-230004-A>
- Concrete construction
It is a high-durability, lightweight, simple, and easy-to-handle resin system formwork! <NETIS registration number: KT-230004-A>
- Concrete construction