Subsurface Correction Work | Identification of Buried Waste! Pressure Plate Jack-Up Renovation
Subsidance correction work
Identifying the subsidence of buried waste in survey gaps! Achieving structural regeneration at the base through pinpoint underground exploration and jack-up of the pressure plate.
In large-scale renovations and seismic reinforcement plans, the debris and buried waste hidden in the blind spots of ground survey data pose a hidden risk of uneven settlement, leading to floor re-tilting and fixture issues after completion. Simply updating the upper structure neglects the softening of the ground beneath, making it impossible to achieve the building's inherent longevity. At Geotech, we conduct hand auger drilling and pinpoint subsurface exploration as part of our pre-construction ground and foundation diagnosis, visualizing the extent of buried waste and settlement factors with objective numerical data. For horizontal adjustments, we apply a jack-up method for pressure slabs that eliminates the need for extensive demolition. Using small hydraulic jacks, we perform precise horizontal restoration in millimeter increments, leveraging the building's weight as a reaction force. After lifting, we pressure-inject high-flow air-entrained mortar into the voids beneath the floor to equalize ground pressure, and we encapsulate the damaged fabric foundation structure with high-adhesion epoxy resin to restore structural strength beyond that of new construction. Geotech's settlement correction construction menu enhances the overall quality and durability of the renovation.
Inquire About This Product
basic information
This is a technology for ground reinforcement and uneven settlement correction before the renovation of existing detached houses (wooden, lightweight steel, cloth foundation, and flat foundation). For underground obstacle exploration, we employ hand auger drilling and probing with a probe rod, and for settlement measurement, we use a high-precision digital laser level. In settlement correction, we install structural carbon steel plates (over 12 mm thick and at least 500 mm square) or concrete pressure plates, and perform millimeter-level horizontal correction through synchronized operation of small hydraulic jacks. For foundation reinforcement, we use high-adhesion epoxy resin injection material, and we pressurize and densely fill the gaps under the floor with lightweight bubble mortar (air milk).
Price range
Delivery Time
Applications/Examples of results
It will be used for correcting local subsidence of existing houses caused by underground buried waste, as well as for foundation reinforcement and horizontal restoration before renovation and seismic retrofitting work. It is ideal for renovation sites that want to prevent floor re-slope issues and fixture malfunctions after the completion of renovation work, and to enhance the original structural strength and seismic performance of the building beyond that of a new construction. It meets the needs of clients who wish to complete the structural health of their foundations in a short period while living in the house, without incurring any costs for temporary housing or demolition work. It is widely used for differentiating technical proposals by renovation contractors and builders, as well as for proposing GeoTech's subsidence correction work menu.
catalog(4)
Download All Catalogs
Company information
-







![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)