Ground reinforcement work using the Cross Wing Column method [for infrastructure development].
Cross Swing Column Method
Acquisition of GBRC performance certification. Realization of settlement prevention through high-precision deep mixing construction method.
In infrastructure development, ground subsidence measures are essential for ensuring the long-term stability and safety of structures. Particularly on roads with heavy traffic and important structures, even minor ground movements can lead to significant issues, necessitating highly reliable reinforcement technologies. The Cross-Wing Column Method has obtained the Architectural Technology Performance Certification (GBRC Performance Certification) from the General Incorporated Foundation Japan Building Disaster Prevention Association and effectively suppresses subsidence through high-precision construction. 【Application Scenarios】 - Foundations of infrastructure structures such as roads, bridges, and tunnels - Civil engineering structures like rivers and port facilities - Ground improvement associated with large-scale developments 【Benefits of Implementation】 - Extended lifespan of structures due to subsidence suppression - Reduced maintenance costs - Improved safety of the entire infrastructure system
Inquire About This Product
basic information
【Features】 - A highly reliable construction method certified by GBRC performance certification - Achieves stable mixing performance unaffected by soil quality - Assured high quality with a coefficient of variation of 25% or less - Small surcharge coefficient for quality control, suppressing excessive material use - Strict quality inspection based on the principle of adopting "Inspection Method A" 【Our Strengths】 Geotech provides "total ground services," offering a one-stop solution for all tasks related to "ground," including ground surveys and reinforcement design/construction for new buildings (from general construction to single-family homes), settlement correction work for existing buildings, soil contamination surveys, and ground information services. With extensive experience and reliable technology, we create the future of cities from the ground up.
Price range
Delivery Time
Applications/Examples of results
It is suitable for sandy soil, clayey soil, and loam as applicable ground, making it ideal for ground reinforcement measures for a wide variety of structures such as buildings, retaining walls, and other constructions. It is also widely adaptable to small-scale buildings that meet all conditions, including mid-rise buildings, iron towers, various structures, and those with three stories or fewer above ground, a maximum height of 13 meters, a eave height of 9 meters or less, and a total floor area of 500 m² or less, as well as retaining walls of 3.5 meters or less in height. Depending on the site conditions, construction machinery (10t class and 15t class) and plants can be selected from small to large sizes, allowing for flexible construction results that are not affected by narrow sites or adjacent environments. Depending on the ground conditions, it is possible to propose shortening construction periods and reducing costs by supporting at depths shallower than that of bearing piles.
catalog(2)
Download All CatalogsCompany information
-


![[For Infrastructure Development] Ground Reinforcement Work | Cross Wing Column Method](https://image.www.ipros.com/public/product/image/321794/IPROS2104997915962662896.png?w=280&h=280)

![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)