Designated Investigation Agency | Safety Verification of Construction Excavated Soil through Official Analysis
Soil survey
Flexible response to diverse acceptance criteria. We thoroughly demonstrate the safety of construction-generated soil through high-precision official analysis.
We will eliminate risks such as "undetermined disposal site" and "refusal of removal" for construction stakeholders through high-precision public analysis conducted in advance. We provide one-stop support from specification confirmation to meet the strict standards of municipal regulations and private acceptance sites. This includes comprehensive services such as all-layer sampling in accordance with Chiba Prefecture regulations, additional analyses for oil content and dioxins, and new registration procedures. We issue evidence with measurement certificates as quickly as possible to eliminate waiting losses and delays in construction schedules. We strongly support clean and low-cost removal plans. Please feel free to consult with us.
Inquire About This Product
basic information
■Applicable regulations and standards: Soil Contamination Countermeasures Act, residual soil regulations of each prefecture, voluntary acceptance standards for designated disposal sites ■Sampling method: Rotary double-tube sampler, impact-driven simple boring (contamination prevention and anhydrous drilling specifications) ■Sampling depth and layers: Vertical layer equal quantity sampling linked to the maximum designed excavation depth ■Measurement and analysis items: 26 specific harmful substances, oil concentration, dioxins, pH, and other additional items specified by the acceptance site ■Issued documents: Measurement certificate in accordance with the Measurement Act, a complete set of site-specific registration documents complying with rules prohibiting the reuse of other site data, sampling location map, depth and lot-specific management data.
Price information
-
Price range
P3
Delivery Time
P4
Applications/Examples of results
The construction-generated soil arising from root excavation and pile work in construction and demolition projects is used in situations where it is completely compliant with the residual soil regulations of each prefecture (such as Chiba Prefecture's residual soil regulations) and the acceptance approval standards set by private disposal sites, allowing for trouble-free transportation. It is ideal for establishing a pre-specification confirmation flow conducted on a tight schedule before construction starts, implementing vertical layer sampling linked to the maximum excavation depth, covering additional analysis items unique to the disposal site such as oil content and dioxins, and swiftly issuing measurement certificates and application documents specific to the relevant site in accordance with the strict rules against the reuse of other site data applied in public works, thereby thoroughly preventing construction delays and optimizing residual soil disposal costs.
catalog(3)
Download All Catalogs
Company information
-








![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)