Precise Bearing Capacity Evaluation Survey for New Construction on Soft Ground Buildings
Boring survey
Prevent construction troubles in new buildings on weak ground in advance and reduce costs.
In real estate development, the construction of buildings on weak ground poses risks such as insufficient pile length, excessive driving, and rework. In cases of uneven soil layers or sloped bearing layers, conventional surveys may misidentify the bearing layer, leading to construction delays and additional costs. Our high-precision ground surveys use a fully automated continuous measurement system to measure multiple points with high density. We visualize the three-dimensional undulations of the bearing layer and the allowable vertical bearing capacity, allowing us to identify the minimum required pile length and layout for each column in advance. This prevents unnecessary work and delays, optimizing site management. 【Usage Scenarios】 - New building construction on weak ground - Understanding complex ground bearing layers - Reducing the risk of cost increases due to pile length discrepancies - Preventing construction troubles in advance 【Benefits of Implementation】 - Cost increase suppression - Prevention of rework - Optimization of site management - Reduction of total construction costs and project duration
Inquire About This Product
basic information
【Features】 - High-density data collection through a fully automatic continuous measurement system - Automatic recording of penetration resistance and rotational torque at 200mm intervals - Capable of reaching a maximum exploration depth of 30m, suitable for hard strata equivalent to an N value of 50 - Objective data calculation that eliminates human error and judgment variability - Clear visualization of the three-dimensional undulations of support layers and allowable vertical bearing capacity 【Our Strengths】 Geotech provides "total ground services," offering a one-stop solution for all ground-related tasks, including ground surveys and reinforcement design/construction for buildings, settlement correction work for existing structures, and soil contamination investigations. With extensive experience and reliable technology, we create the future of cities from the ground up.
Price range
Delivery Time
Applications/Examples of results
It is utilized for determining pile lengths and optimizing pile layouts in the foundation construction of new mid-rise and high-rise buildings, commercial buildings, and reinforced concrete condominiums, primarily in soft ground areas and urban redevelopment districts. It is ideal for projects that aim to completely eliminate unexpected pile length rework risks and unnecessary excess pile cutting work, thereby reducing on-site management costs and construction periods for general contractors and construction companies. Additionally, it is widely adopted in construction plans that seek to prevent measurement errors from manual work and to smoothly advance safe pile driving construction based on reliable digital evidence.
catalog(3)
Download All Catalogs
Company information
-



![[For House Manufacturers] Precise Bearing Capacity Evaluation Survey for New Building on Weak Ground](https://image.www.ipros.com/public/product/image/321794/IPROS11310895596292383613.png?w=280&h=280)




![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)