【Confident in Price】This is a high-strength, high-durability net designed to catch falling pieces of deteriorated concrete from bridge components.
No curing is required, the construction period is short, and rapid response to concrete spalling is possible. Additionally, the deterioration progress of the structural body can be visually confirmed even after construction. 【Method Features】 - No curing is required, the construction period is short, and rapid response to concrete spalling is possible. - Compatible with various types of bridges such as RC, PC, and ME. - Can be processed to any size according to the form of the structure. - Easy to process and adjust due to the flexible synthetic fiber net. - The deterioration progress of the structural body can be visually confirmed even after construction. - Easy site management during construction allows for uniform execution. For more details, please contact us.
Inquire About This Product
basic information
Net Material: Nylon Russell Mesh (Black Base) Net Weight: Approximately 500g/sqm Mesh Size: 10mm Surrounding Rope and Sag Prevention Rope Thickness: φ6mm Strength Characteristics: Over 7KN Specifications and Features - Uses a lightweight, high-strength color Russell mesh that is resistant to fraying. - The mesh size is 10mm, capable of catching small concrete fragments of 1-2cm as well as falling objects weighing up to 120kg. - Utilizes a mesh material with minimal sagging, featuring a square mesh design. - The net has flame-retardant properties that prevent secondary fires in cases such as vehicle fires on roads (compliant with JIS L 1091). - Made from nylon material with high durability against concrete alkalinity. - Uses a special thick black nylon material with high durability against ultraviolet rays from the sun.
Price information
Please contact us. 【From Inquiry to Delivery】 1. Inquiry: Confirm product, quantity, and delivery location, and submit a quotation. 2. Order: Please confirm the quotation details and place your order. 3. Confirmation of Delivery Method: Confirm delivery location, desired delivery date, and method of receipt. 4. Delivery: We strive for reliable and careful delivery. 【Transaction and Payment Terms】 As a general rule, payment terms are end-of-month closing for the delivery month, with cash (bank transfer) payment by the end of the following month. Depending on the credit status of our clients, we may request advance payment.
Delivery Time
Applications/Examples of results
Concrete fragment fall prevention net
catalog(1)
Download All CatalogsCompany information
Company Name FCR Corporation (FCR) *Field Cross drain: Refers to a railway crossing drainage channel. *Repair: Refers to maintenance. Our company operates the FCR Method Association and the Antiviral and Antibacterial Association.





