Lightweight bridge maintenance and preventive maintenance products that are easy to attach to existing bridges.
We would like to introduce our aluminum alloy inspection channel, "Kero." It is constructed from aluminum alloy, which is resistant to corrosion from salt damage and UV degradation, making it maintenance-free. Additionally, we implement insulation treatment using rubber sheets to prevent galvanic corrosion from contact with dissimilar metals. With a standard weight of approximately 36 kg per meter, it is about half the weight of traditional steel inspection channels, allowing for manual installation. 【Features】 ■ High safety ■ Excellent corrosion resistance ■ Lightweight ■ Good workability ■ Focus on ease of walking *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Inspection Route Options】 ■Ladder ■Stairs for Substructure ■Floor Material ■Inspection Hatch ■Cable Rack *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Achievements (Example)】 ■ Togashima Ohashi Bridge ■ Southern Gate Bridge ■ Ikitsuki Ohashi Bridge ■ Kosakabekawa Bridge ■ Suzawa Bridge ■ Meishin Hayashida No. 2 Viaduct *For more details, please download the PDF or feel free to contact us.
Company information
Sumitomo Light Metal Industries, Ltd. Engineering Co., Ltd. was established as a joint venture on August 1, 2000, through the integration of the Urban Engineering Division of Sumitomo Light Metal Industries, Ltd. (now UACJ Corporation) and the Landscape Engineering Division of Japan Light Metal Co., Ltd., which were both spun off. In 2020, marking its 20th anniversary, the company changed its name to Nikkei Engineering Co., Ltd. as a new member of the Japan Light Metal Group. "A beautiful town and your aluminum future." We aim to be a company whose mission is to enrich the future of towns and people by combining aluminum and technology.









