Standard maintenance and disassembly processes that maintain high reliability! Supporting the longevity of electric motors with strict standards from acceptance to shipment.
This is a standard maintenance and disassembly service based on the "Electric Motor Maintenance Workflow" provided by Nichiko Electric Co., Ltd., aimed at maintaining high reliability. We offer traceable maintenance from pre-diagnosis upon receipt, detailed inspections, precision disassembly and cleaning, parts replacement (preventive maintenance), assembly and final testing, to the preparation and delivery of reports.
Inquire About This Product
basic information
Response Process (Workflow) 1. Acceptance and Preliminary Diagnosis (Insulation resistance check, winding resistance measurement, visual inspection) 2. Disassembly and Cleaning (Disassembly using specialized tools, cleaning of brackets and rotors, removal of grease and dust) 3. Detailed Inspection and Measurement (Electrical measurement of winding and insulation resistance, dimensional measurement for wear and tolerance assessment) 4. Parts Replacement and Preventive Maintenance (Replacement of bearings, seals, etc. with new parts, re-impregnation of varnish, shaft polishing, etc.) 5. Assembly and Final Testing (Centering and clearance adjustment, performance confirmation through no-load rotation) 6. Report Preparation and Delivery (Preparation of performance report using inspection data and photographs)
Price range
Delivery Time
Applications/Examples of results
Regular inspection, overhaul, disassembly maintenance, and preventive maintenance of various electric motors. Early detection of insulation degradation due to moisture and aging, and prevention of ground faults. Elimination of bias and burn risk through resistance value leveling of three-phase coils. Reduction of mechanical losses by addressing grease deterioration and removing dust in bearing areas. Regular maintenance and reliability improvement of various electric motors used in factory equipment and plants. Precise inspection, parts replacement, and reconditioning of electric motors showing abnormal signs such as unusual noises, vibrations, or performance degradation.
Company information
At the "Osaki Industrial Fair 2025" held on October 17th (Friday) and 18th (Saturday) of Reiwa Year 7, we were fortunate to connect with many people. Thank you to everyone who attended. ☆☆☆☆★☆☆☆☆★☆☆☆☆★☆☆☆☆★☆☆☆☆ As the general agent for floor heating systems and snow melting systems, we respond to a variety of needs not only in general residences across Tohoku but also in welfare facilities and public institutions, with the latest system variations and comprehensive total support. You can experience comfortable warmth from the morning with heat stored overnight. The "storage-type floor heating system," which utilizes nighttime electricity, is economical and represents the ideal system of having a cool head and warm feet. Since it does not use any open flames indoors and does not require space for heating equipment, it is perfect for nurseries, kindergartens, and welfare facilities.







![Proposal for Recycled PVC Pipes (PVC Pipes) [Material Recycling]](https://image.www.ipros.com/public/default/object/noimage_l.gif?w=280&h=280)


