iPROS Urban Planning
  • Search for products by classification category

    • Building Materials
      Building Materials
      36752items
    • Facilities
      Facilities
      57960items
    • Lighting and Interior
      Lighting and Interior
      17507items
    • Common materials
      Common materials
      37232items
    • Civil Engineering Materials
      Civil Engineering Materials
      10149items
    • Construction, work and methods
      Construction, work and methods
      28838items
    • Surveys, Measurements, and Services
      Surveys, Measurements, and Services
      29872items
    • IT/Software
      IT/Software
      33399items
    • others
      others
      82129items
    • Store and facility supplies
      Store and facility supplies
      4608items
    • Office and commercial supplies
      Office and commercial supplies
      11733items
    • Hospital and welfare facility supplies
      Hospital and welfare facility supplies
      1053items
    • Logistics Equipment
      Logistics Equipment
      7308items
    • Energy and Resources
      Energy and Resources
      12098items
  • Search for companies by industry

    • Information and Communications
      7300
    • others
      7202
    • Building materials, supplies and fixtures manufacturers
      6600
    • Service Industry
      4725
    • Trading company/Wholesale
      3056
    • Other construction industries
      2437
    • Electrical equipment construction business
      685
    • Construction Consultant
      564
    • Interior Design
      518
    • Facility Design Office
      491
    • General contractors and subcontractors
      417
    • retail
      361
    • Architectural design office
      360
    • Warehousing and transport related industries
      327
    • Electricity, Gas and Water Industry
      288
    • Housing manufacturers and construction companies
      279
    • Interior construction business
      277
    • Building Management
      274
    • Medical and Welfare
      274
    • Educational and Research Institutions
      253
    • Renovation and home construction industry
      222
    • Water supply and drainage construction business
      204
    • Transportation
      169
    • Real Estate Developers
      163
    • Fisheries, Agriculture and Forestry
      131
    • Structural Design Office
      65
    • Finance, securities and insurance
      41
    • Restaurants and accommodations
      31
    • self-employed
      31
    • Mining
      26
    • Public interest/special/independent administrative agency
      20
    • Police, Fire Department, Self-Defense Forces
      17
    • Store and building owners
      9
    • Government
      9
    • Individual
      9
    • Property Owner
      8
  • Special Features
  • Ranking

    • Overall Products Ranking
    • Overall Company Ranking
Search for Products
  • Search for products by classification category

  • Building Materials
  • Facilities
  • Lighting and Interior
  • Common materials
  • Civil Engineering Materials
  • Construction, work and methods
  • Surveys, Measurements, and Services
  • IT/Software
  • others
  • Store and facility supplies
  • Office and commercial supplies
  • Hospital and welfare facility supplies
  • Logistics Equipment
  • Energy and Resources
Search for Companies
  • Search for companies by industry

  • Information and Communications
  • others
  • Building materials, supplies and fixtures manufacturers
  • Service Industry
  • Trading company/Wholesale
  • Other construction industries
  • Electrical equipment construction business
  • Construction Consultant
  • Interior Design
  • Facility Design Office
  • General contractors and subcontractors
  • retail
  • Architectural design office
  • Warehousing and transport related industries
  • Electricity, Gas and Water Industry
  • Housing manufacturers and construction companies
  • Interior construction business
  • Building Management
  • Medical and Welfare
  • Educational and Research Institutions
  • Renovation and home construction industry
  • Water supply and drainage construction business
  • Transportation
  • Real Estate Developers
  • Fisheries, Agriculture and Forestry
  • Structural Design Office
  • Finance, securities and insurance
  • Restaurants and accommodations
  • self-employed
  • Mining
  • Public interest/special/independent administrative agency
  • Police, Fire Department, Self-Defense Forces
  • Store and building owners
  • Government
  • Individual
  • Property Owner
Special Features
Ranking
  • Overall Products Ranking
  • Overall Company Ranking
  • privacy policy
  • terms of service
  • About Us
  • Careers
  • Advertising
  1. Home
  2. ProductSearch
  3. Construction, work and methods
  4. Construction Works
  5. Parking lot facility construction
  6. Paved Surface Installation Type Parking Lot Greening Method "Tough Tough Park 55"

Paved Surface Installation Type Parking Lot Greening Method "Tough Tough Park 55"

  • Added to bookmarks

    Bookmarks list

    Bookmark has been removed

    Bookmarks list

    You can't add any more bookmarks

    By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

    Free membership registration

last updated:Jul 08, 2026

日本植生
日本植生
  • Special site
  • Official site

We can convert the existing parking lot into green space with the maximum area and the shortest construction period.

【Features】 ■ Direct installation on existing pavement! ■ Possible to construct in divided small areas ■ Green coverage rate of over 90% ■ Elimination of height differences with existing pavement is also possible There is no need for the removal of existing asphalt or earthworks, which can reduce removal and disposal costs. The construction period can also be shortened, allowing for minimal yard work even when a factory is operational or alternative parking cannot be provided. If lowering is required, separate consideration for drainage methods (such as buried drains) will be necessary. If alternative parking spaces cannot be secured during the construction period, the construction area can be divided for execution. There have been cases where approximately 100 parking spaces were constructed in three phases (approximately 10 to 20 spaces over about 5 days). The protruding parts of the grass protection material are designed to withstand the minimum necessary pressure and load (supporting a total weight of 25 tons), protecting the grass from damage caused by vehicle pressure and abrasion. During expansions or renovations of factories, the maximum green space can be secured within limited areas such as employee parking lots, compensating for any lack of green space. (The criteria for inclusion in green space may vary by municipality) *Please feel free to contact us for more details.

    Wall and rooftop greeneryParking lot facility constructionLandscaping
id="product-main-img"

Paved Surface Installation Type Parking Lot Greening Method "Tough Tough Park 55"

NS路盤7.jpg タフタフ55-ip-2.jpg タフタフ55-ip-3.jpg タフタフ55-ip-4.jpg タフタフ55-ip-5.jpg NS路盤5.jpg NS路盤9.jpg
  • Related Link - https://nihon-shokusei.co.jp/method/method-2288/
  • Special site - Product/service details - https://pr.www.ipros.com/nihon-shokusei/product/

Inquire About This Product

  • Contact Us Online
  • Download catalog

basic information

【Lineup】 ■ Installed on existing pavement - Tough Tough Park 55 ■ With subgrade improvement - Tough Tough Park t=280mm specification (with underground irrigation system) - Tough Tough Park t=280mm specification - Tough Tough Park t=180mm specification ■ Without subgrade improvement - General parking lot greening *For more details, please download the PDF or feel free to contact us.

Price range

Please contact us for details

Delivery Time

Please contact us for details

Applications/Examples of results

- Securing green space during expansion and renovation - Counting asphalt-paved parking lots as green space - Renewal of green spaces that have deteriorated and are no longer considered green - Measures for factory location law - Enhancing added value with green landscapes - Use as public open space - Environmental facilities / exterior works / repairs / reduction of industrial waste - Measures against rainwater infiltration obstruction / rainwater runoff control / rainwater infiltration and storage - Green infrastructure

catalog(4)

Download All Catalogs
"Tough Tough Park 55," a parking lot greening method that allows existing parking lots for factories, employees, and visitors to be directly included in the green space area as paved surface-installed parking lots.

"Tough Tough Park 55," a parking lot greening method that allows existing parking lots for factories, employees, and visitors to be directly included in the green space area as paved surface-installed parking lots.

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Japan Vegetation Co., Ltd. - Riverbank Protection and Greening Method Catalog

Japan Vegetation Co., Ltd. - Riverbank Protection and Greening Method Catalog

CATALOG
  • E-book viewing
  • Catalog download

Contact this catalog

Comprehensive Catalog of Environmental Greening Products

Comprehensive Catalog of Environmental Greening Products

CATALOG
  • E-book viewing
  • Catalog download

Contact this catalog

Integrated parking lot greening method "Tafutafu Park" for roadbed layers.

Integrated parking lot greening method "Tafutafu Park" for roadbed layers.

PRODUCT
  • E-book viewing
  • Catalog download

Contact this catalog

Company information

日本植生

日本植生

Building materials, supplies and fixtures manufacturers

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
  • Special site
  • Official site
Phone number/address

Since our founding, we have taken on the mission of "creating a green country" and have contributed to national greening, land conservation, and the creation of a rich natural environment through our greening projects. Even in the 21st century, often referred to as the era of the environment, we strive to be an "environmental creation company" that applies the technologies we have cultivated in greening to the improvement of the environment for the Earth and its people, engaging in creativity (planning, research, and development). In 2024, we recognize biodiversity conservation, a pressing social issue, as a new mission we must undertake, with our participation in the 30by30 Alliance and the certification of our research fields as "natural coexistence sites." Moving forward, we will actively address various social issues, starting with biodiversity conservation, in pursuit of a sustainable society. We aim to be a lasting company that meets the needs of local communities, promoting the greening of parking lots to mitigate the heat island effect, as well as greening watersheds, riverbanks, coastlines, and parks to propose a lush living environment.

Product/Service List (336)

Popular products in related categories

【Construction Example】Greening of a parking lot that can be completed in a short period and with minimal yard space.
Construction, work and methods
【Construction Example】Greening of a parking lot that can be completed in a short period and with minimal yard space.
日本植生
Integrated parking lot greening method "Tafutafu Park" for roadbed layers.
Construction, work and methods
Integrated parking lot greening method "Tafutafu Park" for roadbed layers.
日本植生
Paved Surface Installation Type Parking Lot Greening Method "Tough Tough Park 55"
Construction, work and methods
Paved Surface Installation Type Parking Lot Greening Method "Tough Tough Park 55"
日本植生
[Construction Example] Greening of the asphalt (pavement) factory employee parking lot.
Construction, work and methods
[Construction Example] Greening of the asphalt (pavement) factory employee parking lot.
日本植生
Wall Greening Method "Climbing Power Panel with Anti-Climbing Type"
Building Materials
Wall Greening Method "Climbing Power Panel with Anti-Climbing Type"
ダイトウテクノグリーン

Related New Products

Rooftop Greening System "Prio Garden"
Building Materials
Rooftop Greening System "Prio Garden"
アーキヤマデ
Oil Separator (Gasoline Trap) Selection Guide
Facilities
Oil Separator (Gasoline Trap) Selection Guide
プレパイ工業
Folding Cone [Flat Safety Cone]
Common materials
Folding Cone [Flat Safety Cone]
TOWA
PP Type Fireproof Oil Trap (Gasoline Trap)
Facilities
PP Type Fireproof Oil Trap (Gasoline Trap)
プレパイ工業
Rooftop greening system - Rooftop greening without the need for irrigation - Evergreen Kiri grass bag method
Building Materials
Rooftop greening system - Rooftop greening without the need for irrigation - Evergreen Kiri grass bag method
緑化計画研究所

The related categories of Wall and rooftop greenery

  • Construction, work and methods
  • Construction Works
  • Parking lot facility construction
  • Surveys, Measurements, and Services
  • Construction related services and equipment
  • Landscaping
  • Building Materials
  • Roofing materials
  • Wall and rooftop greenery
Find products and companies by related keywords
  • #Construction method
  • #Greening method
          

Inquire About This Product

  • Contact Us Online
  • Download catalog

Products

  • Search for Products

Company

  • Search for Companies

Special Features

  • Special Features

Ranking

  • Overall Products Ranking
  • Overall Company Ranking

support

  • site map
IPROS
  • privacy policy Regarding external transmission of information
  • terms of service
  • About Us
  • Careers
  • Advertising
IPROS Services
  • >IPROS GMS | Search site for the manufacturing industry
  • >IPROS | Search site for the B2B industry
COPYRIGHT © 2001-2026 IPROS CORPORATION ALL RIGHTS RESERVED.
Please note that the English text on this page is automatically translated and may contain inaccuracies.