We will confirm and record the construction status after the repair work, supporting the verification of repair effectiveness and the updating of the maintenance management ledger.
After the repair work is completed, this service can be utilized in situations where you want to confirm whether the repairs have been properly executed and to keep a record comparing the condition before and after the repairs. This service conducts close visual inspections and sound tests after the repair work, confirming the construction status and creating comparison records before and after the repairs. It can be used as verification materials for the effectiveness of the repairs, as attachments for the completion report, and as updated materials for maintenance management records.
Inquire About This Product
basic information
【Contents of the Confirmation Survey】 - Close visual inspection and sound testing after repairs - Comparative record of condition before and after repairs - Confirmation of repair scope and quality (confirmation through appearance and sound testing) - Confirmation and recording of remaining damage locations 【Deliverables】 - Comparison photo ledger before and after repairs - Deformation diagram after repairs (confirmation of remaining damage) - Repair effectiveness confirmation report - Update materials for maintenance management ledger 【Applicable Facilities and Delivery】 - Road bridges, pedestrian bridges, agricultural road bridges, road tunnels, etc. - Support for a consistent record system from pre-repair surveys - Delivery: PDF report, photo data, Excel ledger, etc.
Price information
Individual Estimate Costs vary depending on the content of the investigation, the scale of the facility, site conditions, and the type of deliverables. Please feel free to consult with us first.
Applications/Examples of results
【Purpose】 - Confirmation of construction quality after repair work - Verification of repair effects through comparison of records before and after repairs - Preparation of attached documents for completion reports - Updating maintenance management ledgers and organizing baseline data for the next inspection 【Examples of Achievements】 - Confirmation survey and preparation of comparison report after pier repair work - Quality confirmation of construction through sound inspection after tunnel lining repairs - Cases where records before and after repairs were accumulated and maintenance management ledgers were updated - *Details of achievements will be provided in materials or upon inquiry.
catalog(1)
Download All CatalogsCompany information
Since its establishment in 1966, East Japan Construction Consultant has been proposing "aha!" moments centered around surveying and design technology for many years. Starting with surveying and expanding into design, land acquisition, compensation, and infrastructure maintenance, we have worked as a comprehensive construction consultant to enhance our services. We have been engaged in the development and maintenance of social infrastructure that supports people's safety, security, and economic activities, including roads, rivers, ports, marine surveys, urban planning, and energy. Currently, in addition to our efforts in disaster prevention, mitigation, and national resilience, we are also focusing on digital transformation (DX) through initiatives such as BIM/CIM, AI, UAVs, and ROVs (underwater drones).




