We will review the costs and efforts involved in bridge and tunnel inspections by optimizing the collective inspection and inspection planning of multiple facilities.
"The inspection costs are putting pressure on the annual maintenance budget." "Costs are accumulating because multiple facilities are being ordered individually." — Cost management for bridge and tunnel inspections is a common issue for road administrators and local governments. This service supports the reduction of total costs through bulk inspections of multiple facilities, regular outsourcing contracts, and consultations on reviewing inspection frequency and content. You can consult us even if you are at the stage of wanting to confirm whether the current inspection costs are appropriate or wanting to lower costs by placing a consolidated order.
Inquire About This Product
basic information
【Cost Reduction Measures】 - Consolidated inspections of multiple facilities (bridges and tunnels) to distribute mobilization costs - Annual cost stabilization through regular outsourcing contracts - Consultation on reviewing inspection frequency and content - Standardization and efficiency improvement of report preparation 【Scope of Services】 - Regular inspections of bridges and tunnels (statutory inspections and voluntary inspections) - Detailed damage investigations and pre-repair surveys - Maintenance of inspection records and ledgers, preparation of documents for administrative submission 【Service Area and Deliverables】 - Primarily serving the eastern Japan region (individual consultations for distant areas) - Deliverables: PDF reports, photo ledgers, Excel inspection records, etc.
Price information
Individual estimate The cost varies depending on the content of the investigation, the scale of the facility, site conditions, and the type of deliverables. Please feel free to consult with us first.
Applications/Examples of results
【Purpose】 - Cost reduction through bulk inspection orders for multiple bridges and tunnels - Stabilization of mobilization costs through regular commissioning contracts - Optimization of annual budget by reviewing inspection frequency and content - Simplification of ordering procedures and consolidation of contact points 【Examples of Achievements】 - Case of a road manager who stabilized annual inspection costs through regular commissioning contracts - Case of efficiency improvement in maintenance budget through review of inspection plans and prioritization - *Details of achievements will be provided in materials or upon inquiry.
catalog(1)
Download All CatalogsCompany information
Since its establishment in 1966, East Japan Construction Consultant has been proposing "aha!" moments centered around surveying and design technology for many years. Starting with surveying and expanding into design, land acquisition, compensation, and infrastructure maintenance, we have worked as a comprehensive construction consultant to enhance our services. We have been engaged in the development and maintenance of social infrastructure that supports people's safety, security, and economic activities, including roads, rivers, ports, marine surveys, urban planning, and energy. Currently, in addition to our efforts in disaster prevention, mitigation, and national resilience, we are also focusing on digital transformation (DX) through initiatives such as BIM/CIM, AI, UAVs, and ROVs (underwater drones).

![[Basic Knowledge] What can be done to reduce CO2 emissions? What is environmental value?](https://image.www.ipros.com/public/product/image/d25/2000879241/IPROS00875120294217072060.jpeg?w=280&h=280)



