Record the completed state in 16K×3D! Enable remote consideration for future renovations.
We would like to introduce a case study utilizing "4DKanKan" as a "digital completion drawing" for the maintenance and management of public facilities and infrastructure. Currently, completion records mainly consist of completion photographs and paper drawings/PDFs, which make it difficult to understand equipment layout, connections, and dimensions, leading to the need for re-investigation during renovations. With 4DKanKan, the completion state is recorded in 16K×3D, allowing stakeholders to discuss while viewing the same data through URL sharing. Equipment locations can be identified in 3D, and management can be linked to ledgers, drawings, and histories. 【Case Overview】 ■ Background: Continuous inspections, renovations, and updates are required for the maintenance management of public facilities and infrastructure. ■ Issues - Lack of information in completion records - Discrepancies between drawings/ledgers and current conditions ■ Solutions - High-definition 3D preservation of the completion state - Accelerated consensus building - Centralized linking of ledgers and drawings *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company was established with a strong desire to improve the harsh working conditions of ground surveyors, enhance the reliability of ground survey data, and allow people to build homes with peace of mind. Since our founding in 2008, we have been committed to preventing fraud in the residential ground industry, starting with the GeoWeb System. This system, which suppresses and prevents tampering through automation of work and visualization of data, not only improves the workflow on-site but also contributes to the efficiency of office tasks, achieving an enhancement in the quality of ground surveys and the restoration of trust. Furthermore, by alleviating the workload, it also contributes to increasing the retention rate of ground surveyors.


![[Case Study Collection] An Introduction to Case Studies of Facial Recognition System Implementation](https://image.www.ipros.com/public/product/image/5d6/2001090332/IPROS78993972163647808049.png?w=280&h=280)


