Reduce "wasted costs" arising from mistakes and rework! Towards further "safety" and "efficiency"!
■Visualization of Construction Stages Issues that become apparent during the construction phase, such as interference with the structure and identification of hazardous areas that were not clear during the design phase, can be "visualized" in advance by utilizing Takamiya's BIM. This allows for optimal planning and scheduling, reducing unnecessary costs due to rework or course corrections. ■Visualization of Material Quantities By using Takamiya's original features, calculating material quantities can be done easily with intuitive operations. By simply selecting the required area on the 3D model on the screen, material quantities can be calculated smoothly, making cost estimation effortless. ■Visualization of Process Management Information was previously shared using paper drawings, but when changes occurred, it was cumbersome to revise and distribute the drawings. With Takamiya's BIM, 3D models are centrally managed, allowing for real-time updates of information. Drawings that reflect the latest construction status enable preemptive identification and sharing of issues, reducing adjustments and revisions on-site. ■Smooth Quantity Calculation [A Unique Feature of Takamiya] By utilizing TAKAMIYA commands and ConnecT.oneQS, quantity calculations can be performed smoothly.
Inquire About This Product
basic information
By combining TAKAMIYA commands, one-stop ordering is possible using the web order system! Please feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
■New Construction By using BIM for "front-loading," concerns are visualized in a way that is easy for customers to understand. We adopted the "front-loading" method, which focuses on intensive consideration during the initial stages. By visualizing on-site concerns in advance with BIM, we can share a construction image that takes into account potential issues in a way that is easy for customers to understand. Additionally, by conducting simulations using 3D models, we were able to prevent the long delays and unnecessary costs caused by frequent rework at the design site in advance.
catalog(1)
Download All CatalogsCAD data(2)
Model number | overview | File |
---|---|---|
iq_jwcad | 1. This is made available for the purpose of creating your temporary design plans. Please refrain from using it for any other purposes. 2. The copyright of the CAD data belongs to Takamiya Co., Ltd. Reproduction, modification, etc., without our permission is not allowed. 3. The transfer, resale, lending, or reuse of the CAD data to third parties is not permitted. 4. We cannot accept any responsibility for troubles or damages incurred from drawings or data created using the CAD data. |
|
iq_autocad | 1. This is made available for the purpose of creating your temporary construction plan. Please refrain from using it for any other purpose. 2. The copyright of the CAD data belongs to Takamiya Co., Ltd. Reproduction, modification, etc., without our permission is not allowed. 3. The transfer, resale, lending, or reuse of the CAD data to third parties is not permitted. 4. We cannot accept any responsibility for troubles or damages incurred from drawings or data that use the CAD data. |
|
Company information
We handle everything related to scaffolding, including its construction and design, consistently. In addition to scaffolding, we also offer products such as vibration control devices for wooden houses, solar panel mounting frames, solar carports, and agricultural greenhouses.