[Improvement and Proposal Examples for Architectural Hardware] Key Points for Enhancing Construction Products
Achieving significant time reduction! Introducing a case study on the development of a one-touch leveling band.
The level band supporting the water supply pipe used to be secured with four nuts for each one, which caused variability in the construction time for adjusting the height of the drainage pipe. This became a problem, and there were requests for improvements from house manufacturers, prompting us to take action. By pursuing ease of construction, we developed a one-touch level band that allows for quick fixing after height adjustment, achieving significant time savings. Additionally, the development of a locking mechanism eliminated the risk of detachment. 【Key Points】 - Level bands, gutter brackets, and internal hanging brackets are installed in approximately 20 to over 100 units in a single house. - Manual screw fastening for each one does not improve on-site construction efficiency. - By switching to one-touch fittings for any part, we can greatly contribute to reducing construction time and improving construction quality. *For more details, please download the PDF or feel free to contact us.*
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Since its founding over 50 years ago, Takayama has been committed to creating products with the concept of "Life Saving TAKAYAMA," focusing on the safety of homes as the center of daily life. We are now adding a new concept, "Life Happiness TAKAYAMA," which enhances the feeling of "comfort" and "happiness" in everyday living, and we will continue to propose a more fulfilling and reassuring lifestyle.