Expansion device secondary waterproofing material component 'Double Waterproofing Unit'
Double Water Stop Unit Method A/Method B
Bed-mounted type and body-mounted type! Continuous secondary water stop structure without joints.
The "Double Water Stop Unit" is a secondary water stop component with a continuous, joint-free structure that drains leakage and allows for guidance. Two methods (Method A / Method B) are available to accommodate various conditions. The installation of this unit can be done simultaneously during joint work. 【Types】 ■ Method A: Double Water Stop Unit for Floor Slab Installation ■ Method B: Double Water Stop Unit for Main Body Installation 【Features】 ■ A continuous, joint-free secondary water stop structure that drains leakage and allows for guidance ■ Two methods available to accommodate various conditions (Method A / Method B) ■ Simultaneous installation of the Double Water Stop Unit during joint work is possible *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price information
■Price: Please contact us for details. *Prices may vary depending on specifications and installation conditions. For more information, please contact us.
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
Line up(2)
Model number | overview |
---|---|
Bed Plate Installation Type (Method A) | |
Main Body Installation Type (Method B) |
catalog(1)
Download All CatalogsCompany information
Our company, a specialized manufacturer of expansion devices for bridges and elevated roads, has been in operation for 60 years since its founding in 1965. While responding to needs such as safety, drivability, durability, and cost-effectiveness, we support a better road and living environment as a company that plays a part in social infrastructure. Even during disasters that have occurred across the country, our products have minimized damage, fostering greater safety and trust. "Together with people, roads, and the environment" We will continue to walk this path.