[Improvement Idea] Visualization of loading capacity for logistics warehouses and large racks.
The sensor signals are visualized more clearly by changing the display colors, which increases the efficiency of the operators.
【Customer's Issue】 To improve the work efficiency of replenishment workers, we want to make it easy to determine the loading capacity of racks at a glance. 【Proposed Solution】 We visualized the loading capacity using the LA6-POE model and a photoelectric sensor, enabling replenishment workers to make immediate decisions on incoming items. ↓↓↓ Official Online Shop PATLITE SHOP Listing Page ↓↓↓ https://online-shop.patlite.co.jp/c/problem/problem_0069
Inquire About This Product
basic information
Specifications: 【Proposed Product】 Stacked Information Display Light (Φ60) LA6-POE Series
Price range
Delivery Time
Applications/Examples of results
Applications and Examples of Achievements: [Adopted Product] LA6-5DTNWB-POE
catalog(1)
Download All CatalogsCompany information
Since our founding, we have contributed to society with the corporate philosophy of delivering "safety, security, and ease" to people around the world, manufacturing products such as display lights, rotating lights, vehicle equipment, and audio devices.


![[FA Site Improvement Case] Visualization of Abnormal Devices During Instantaneous Voltage Dips](https://image.www.ipros.com/public/product/image/498/2000332190/IPROS71802077196136842438.jpeg?w=280&h=280)
![[Improvement Idea] Optimization of the timing for picking up finished products.](https://image.www.ipros.com/public/product/image/818/2001455049/IPROS12977636625572238809.png?w=280&h=280)
![[FA Site Improvement Case] I want to visualize the number of defective products during equipment downtime.](https://image.www.ipros.com/public/product/image/55b/2000332469/IPROS19030917256733862653.jpeg?w=280&h=280)
![[FA Site Improvement Case] Reducing Non-Operational Losses through Visualization of Downtime](https://image.www.ipros.com/public/product/image/9c3/2000332225/IPROS40840476421155925432.jpeg?w=280&h=280)
![[FA Site Improvement Case] Visualization of the progress of work processes that were previously invisible.](https://image.www.ipros.com/public/product/image/003/2000334909/IPROS16571009663325203894.jpeg?w=280&h=280)



