We will introduce examples of cases where it has been adopted due to the use of casing, ensuring stable quality.
We would like to introduce a case where the Eco-GEO method was adopted for ground improvement in caisson construction. In caisson ground improvement work, ground improvement using gravel piles is the standard specification. Due to the small size of the machinery (width 2.0m, weight approximately 11t), parallel work with other construction projects is possible, leading to a reduction in construction time, which is why this method was adopted. Please feel free to contact us when you need our services. 【Project Overview】 ■ Construction Location: Saitama Prefecture ■ Design and Construction Depth: 4.76m ■ Number of Design and Construction: 292 piles *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
[Reasons for Adoption] ■ In the caisson ground improvement work, ground improvement using gravel piles is the standard specification. ■ The machine is compact (width 2.0m, weight approximately 11t), allowing for parallel work with other construction, which leads to a reduction in construction time. ■ Although the machine is small, it uses casing, ensuring stable quality. *For more details, please download the PDF or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
In the region, we design and construct public civil engineering works and crushed stone ground improvement using the "Eco-GEO Method," while also recruiting construction agents for the Eco-GEO Method nationwide.