Ground improvement method that can reduce the burden on site managers and contribute to shortening construction periods.
Quality control is completed simultaneously with the completion of construction! There is no need to wait for the confirmation of the strength of the test pieces.
We would like to introduce our residential crushed stone ground improvement work, "Eco Geo Method." Since there is no need for a curing period, construction time can be shortened. No water is used during the construction. As the material is crushed stone, there is no need for level management of the pile heads. Additionally, there is no concern about damaging the pile heads during foundation excavation. 【Features】 ■ No curing period required ■ Can be constructed without water ■ No post-testing (test pieces) required ■ No level management of pile heads needed *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
In the region, we design and construct public civil engineering works and crushed stone ground improvement using the "Eco-GEO Method," while also recruiting construction agents for the Eco-GEO Method nationwide.