Shortening yield time through the visualization of parts supply requests.
**Customer's Challenge** Due to a shortage of manpower, timely supply of materials is not being achieved, resulting in yield loss. **Proposed Solution** By visualizing the parts supply requests, we can grasp the out-of-stock situation and reduce yield time. Additionally, by notifying the timing of the requested parts supply, we can also shorten waiting times. ↓↓↓ Official Online Shop PATLITE SHOP Listing Page ↓↓↓
Inquire About This Product
basic information
[Proposed Products] Network Control Signal Light (Text-to-Speech Compatible) NHV4 Series NHV6 Series
Price range
Delivery Time
Applications/Examples of results
[Adopted Products] NHV4-3D-RYG NHV6-3D-RYG
catalog(1)
Download All CatalogsCompany information
Since our founding, we have contributed to society with the corporate philosophy of delivering "safety, security, and ease" to people around the world, manufacturing products such as display lights, rotating lights, vehicle equipment, and audio devices.



![[Case Study] Forklift Call System for Material Supply](https://image.www.ipros.com/public/product/image/46d/2000596682/IPROS32870695719604114221.png?w=280&h=280)

![[Case Study] Resolving Waiting Line Issues at a Golf Driving Range](https://image.www.ipros.com/public/product/image/48c/2000622110/IPROS99523102203486681603.jpeg?w=280&h=280)
![Simple hand washing station "Oku-sen" [No plumbing work required, ready to use as soon as it arrives!]](https://image.www.ipros.com/public/product/image/100/2000357537/IPROS07366987947003880157.jpeg?w=280&h=280)


![[Rental] SRS220A Headset / Earphone Microphone Set](https://image.www.ipros.com/public/product/image/254366/IPROS4827147386115905832.jpg?w=280&h=280)
