The implementation costs can be fully amortized in less than a year! It can also contribute to reducing total costs.
We would like to introduce a case where the copper ion generation water treatment device "Cu Energy" has led to a reduction in chemical costs and maintenance costs. In the case of a textile-related company, the copper ion water caused the "algae" to die off and the "scale" to dissolve, resulting in several blowdown treatments. After stabilizing the water quality, the blowdown treatments were reduced to a minimum, thereby lowering maintenance costs. In the case of a steel-related company, within about four months of implementation, rust decreased and water quality improved. By continuously circulating copper ion water, rust and corrosion inside the pipes were removed and suppressed, contributing to a reduction in the frequency of equipment updates and overall cost savings. 【Case Overview for Textile-Related Company】 ■ Issues Considered: Cooling tower wastewater environmental measures & maintenance cost reduction ■ Maintenance Cost Before Implementation: Approximately 10 million yen/year ■ Maintenance Cost After Implementation: Approximately 5 million yen/year *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Overview of Case Study for Steel Industry Companies】 ■Issues Considered: Rust prevention for cooling towers and piping ■Pre-implementation Chemical Cost: Approximately 9.6 million yen/year ■Post-implementation Chemical Cost: Approximately 0 yen/year *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
Our company manufactures copper ion water generation devices and provides various environmental consulting services. Our main product is the water purification device "Cu Energy." Please feel free to contact us if you have any inquiries.