Supports long-lasting walls! Since it is a made-to-order product, the manufacturing lead time is approximately up to 1 month.
We would like to introduce a case study of FIT power installation with a ten-thousand-year wall. One set is installed between the columns. As this is a made-to-order product, the manufacturing lead time may take up to approximately one month. For details regarding lead times and other inquiries, please contact us. 【Features】 ■ One set installed between the columns ■ Manufacturing lead time is up to approximately one month *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(2)
Download All CatalogsNews about this product(3)
Company information
Daikin Corporation aims to "protect human life from the collapse of exteriors during earthquakes" and promotes its seismic exterior business as a social mission, broadcasting from the small rural town of Gujo Hachiman in Gifu to various locations across the country. Craftsmen who inherit traditional techniques carefully create authentic Japanese-style gates, "Sukiya Mon," using carefully selected natural wood (Cypress family, Nootka cypress). Our uniquely developed "FIT Method" produces imaginative original gates and walls, "FIT GATE" and "FIT WALL." We provide seismic reinforcement hardware, "FIT Power," to strengthen old concrete block walls and other structures in anticipation of major earthquakes. We deliver seismic exterior products that fuse traditional Japanese techniques with modern technology.