A new system of suspended shelf scaffolding that achieves labor-saving and improved safety through the push-out method.
The "TENMAX Precast Floor Construction Method" is a technique that uses TENMAX components for precast floor construction, utilizing the components of the VMAX system suspended shelf scaffolding. Traditionally, pipe suspended scaffolding was constructed using bridge inspection vehicles, but by utilizing the TENMAX precast method, difficult tasks that require leaning out from the work floor are eliminated, allowing all precast floor construction to be performed from the work floor, thereby enhancing safety. 【Product Features】 ■ Safe as all construction can be performed from the work floor ■ Provides a wide working space that expands as the precast floor is constructed, improving the working environment for workers ■ Reduction in the number of processes → Minimizes construction time and contributes to cost reduction ■ Reduces the number of traffic regulation days when using bridge inspection vehicles, mitigating the impact on the surrounding environment ■ An effective method for sites where long-term traffic regulations cannot be implemented.
Inquire About This Product
basic information
[Site Conditions] Use the VMAX system as the scaffolding material for construction.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(2)
Download All CatalogsCompany information
We handle everything related to scaffolding, including its construction and design, consistently. In addition to scaffolding, we also offer products such as vibration control devices for wooden houses, solar panel mounting frames, solar carports, and agricultural greenhouses.