[Construction Case] Sugar Factory: Filling Work for the Void Under the Concrete Floor in the Turbine Room
We receive requests because it can be constructed in a short period of time! Using urethane for subsidence correction.
We would like to introduce a case of "filling the voids under the concrete floor in the turbine room" at a sugar factory in Hokkaido. During excavation work next to the external building of the turbine room for another project, a void with a depth of 380mm was discovered under the concrete floor. Since a turbine is installed above in the building, we implemented void filling work as a measure to prevent subsidence. We injected polyurethane resin under the concrete floor in the turbine room to fill the voids, and after the injection, we confirmed the filling using a CCD camera, ensuring that the polyurethane resin was densely filled, and completed the work. 【Case Summary】 ■ Construction Area: Approximately 70m2 ■ Maximum Void Depth: 380mm ■ Construction Period: 1 day ■ Area: Kamikawa District, Hokkaido *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(7)
Download All Catalogs![Concrete pavement slab settlement correction method [Joint step difference and base slab settlement correction method]](https://image.www.ipros.com/public/catalog/image/01/2a4/608051/IPROS7464396502897123536.png?w=120&h=170)
Company information
We carry out construction to correct the sinking, tilting, steps, and gaps in concrete floors caused by uneven ground subsidence in buildings such as factories, warehouses, stores, and general residences, using our unique "Upcon Method" with completely non-fluorinated urethane resin and small machinery. Additionally, we are engaged in public works that utilize technologies developed through various research and development projects to restore the functionality of aging social infrastructure such as roads, airports, ports, and agricultural waterways. ■ Features of the Upcon Method 1. Short construction period: The construction time is 1/10 of conventional methods. 2. No interruption of operations: No need to move machinery or cargo. 3. Comprehensive high technical capability: 100% in-house employees. 4. Compact construction system: Quick restoration to the current state is possible. 5. Reduced risk of re-subsidence: Lower risk of re-subsidence compared to conventional methods. Our in-house staff provides total support from on-site surveys across the country to repair planning and construction, taking full responsibility. Our specialized and experienced in-house staff will propose the optimal repair plan tailored to your site. Upcon Co., Ltd. was newly listed on the Nagoya Stock Exchange Next Market on December 26, 2022.