A case where we proposed a large-capacity generator as a backup for dialysis equipment, directly linked to the patient's life!
We would like to introduce a case where a "LP gas generator" manufactured by GENERAC was installed at a dialysis clinic. At this clinic, it is essential for dialysis machines to operate even during power outages, as stopping dialysis treatment directly affects patients' lives. Since the conditions for securing power extend over long periods, we introduced this product, which is easy to procure and supply fuel for, and can operate continuously for 100 hours. In addition to the dialysis machines, we also considered the indoor environment where patients stay, and proposed a large-capacity generator that can cover lighting and air conditioning as well. 【Benefits of Implementation】 ■ Capable of long hours of continuous operation ■ Lighting and air conditioning can be used in addition to medical equipment ■ Automatic operation allows staff to focus on patient care ■ Established as an emergency reception base for elderly care facilities *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Equipment operating on generator power】 ■ Dialysis machine control panel ■ Dialysis outlet ■ Dialysis room air conditioning ■ Dialysis room lighting ■ Office outlet ■ Indoor lighting *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Since our establishment, we have developed our business around two main pillars: the "Groundwater Utilization System" and the "Energy-Saving System." If your company is considering "reducing water costs" or "implementing an energy-saving system," please feel free to consult with us. With our motto of "Customer First," we will assist you in solving your challenges with forward-looking proposals and a comprehensive support system.




![[Case Study of LP Gas Generator Introduction] Bunka Gakuen Educational Institution](https://image.www.ipros.com/public/product/image/b99/2000877031/IPROS42739810754596657155.jpeg?w=280&h=280)

![LP gas generator [Case for Company F's new hospice construction]](https://image.www.ipros.com/public/product/image/ec4/2001194575/IPROS11867935715231045792.png?w=280&h=280)
![Long Duration Generator JPG2800 (H) [JPG Series]](https://image.www.ipros.com/public/product/image/f38/2000589619/IPROS13423978744402229250.png?w=280&h=280)

![Vehicle-mounted generator [Numerous achievements in relay vehicles, emergency disaster response vehicles, construction work vehicles, etc.]](https://image.www.ipros.com/public/product/image/c81/2001050478/IPROS45619743230035382009.jpeg?w=280&h=280)
![Power Generator [JPG Series] 1.8kVA Output Model Long Duration Generator](https://image.www.ipros.com/public/product/image/de9/2001507379/IPROS27676588681980285293.png?w=280&h=280)
![Three-phase 200V [JPG series] 4.5kVA output model long-duration generator](https://image.www.ipros.com/public/product/image/6a1/2001507492/IPROS4505600401281607992.jpg?w=280&h=280)