Small hydropower generation that also serves as disaster prevention measures: Increased power generation output through dust removal devices.
Example of installing a head tank to supply power to facilities supporting people with disabilities during power outages caused by disasters!
We would like to introduce a case where the dust removal device "JJS-C type" was installed at the head tank of the Suzaka City Yuseiryo Power Plant. Power generation began in November 2020, and during power outages caused by disasters, electricity is supplied to the Suzaka Yuseiryo, a facility supporting people with disabilities. This product was jointly developed with Shinshu University, Fujimaki Construction Co., Ltd., and JSE Co., Ltd. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Maximum water usage: 120L/second ■ Maximum effective drop: 26.4m ■ Maximum output: approximately 18.6kW *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Nihon Engineering Co., Ltd. is a company engaged in the design and construction of water supply facilities, manufacturing and sales of water-related equipment, as well as the design and construction of small hydropower generation (debris removal) and related equipment manufacturing and sales. Based on our long-standing achievements in water supply facility construction and maintenance management, we provide proposals grounded in the field. With our unique technology driven by the spirit of "water supply professionals" and "manufacturing," we respond to our customers' concerns and dilemmas.