[LED Lighting Construction Case Study] Sennan Prefectural Citizen Center Building, Osaka Prefecture
Installation of emergency lighting equipment in the municipal center building! Replacement with LED lighting has been carried out.
We would like to introduce a case study of the "LED lighting installation" we conducted. The installation took place at the Sennan Citizens' Center Building in Osaka Prefecture, where we replaced 10 emergency lights with LED lighting. Additionally, insulation resistance measurements were conducted before and after the installation. Please feel free to contact us if you have any inquiries. 【Case Overview】 ■ Date of Installation: September 2023 ■ Location: Sennan Citizens' Center Building, Osaka Prefecture ■ Content of Work: Replacement of 10 emergency lights with LED lighting *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Our company primarily handles new environmental catalysts such as "Cleanfix®," "Polar Inversion Lightning Rod," and "SPD (Surge Protective Device)." We also carry out general electrical installation work and telecommunications installation work. Please feel free to contact us for LED lighting replacement work from mercury lamps and fluorescent lights at any time.