[Radcon Construction Case Study] Logistics Facility of a Certain Transportation Company in Minato Ward, Tokyo
Intermediate stage - Lamprado waterproofing case! It penetrates with water and forms a waterproof protective layer.
We would like to introduce a case study of "Radcon construction" that we conducted. The construction site is a logistics facility of a certain transportation company in Minato-ku, Tokyo. The construction work involved Radcon waterproofing for intermediate floors and ramps. Our company employs waterproofing methods using "Radcon 7," which can repair cracks on concrete surfaces, and "Radcon Jet," which can be directly sprayed into cracks. 【Case Overview】 ■ Construction Content: Radcon waterproofing for intermediate floors and ramps ■ Construction Location: Minato-ku, Tokyo ■ Related Products - Radcon 7 - Radcon Jet *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Related Product Features】 ■ Radcon 7 - Can repair the waterproof layer in accordance with concrete cracks - Prevents carbonation deterioration - Adhesion, durability, and curing functions ■ Radcon Jet - Self-repairing (following) properties - Neutralization/deterioration prevention - Adhesion *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(4)
Download All CatalogsCompany information
Our company specializes in building leak investigations, Radcon waterproofing, general waterproofing, and water stop construction. If you have any requests, such as wanting to identify the rainwater infiltration routes that could not be determined in past investigations using Radcon 7 for waterproofing work, please feel free to consult with us.