There are benefits to receiving certification, such as utilizing subsidies and tax reduction systems, as well as saving on running costs!
We would like to introduce our "BELS Application Support" service. BELS refers to the Building Energy Efficiency Labeling System, which evaluates and certifies the energy efficiency performance of both new and existing buildings through a third-party evaluation organization. To obtain this certification, it is necessary to undergo evaluation and certification by a third-party organization. Our company provides support from the necessary exterior calculation and primary energy consumption calculation for the evaluation application to the completion of the review. **Benefits of receiving BELS certification:** - Eligibility for subsidies and tax reduction programs - Serves as proof of performance when selling, increasing value - Savings on running costs - High reliability due to evaluation and certification by a third-party organization *For more details, please refer to the related links or feel free to contact us.*
Inquire About This Product
basic information
【Overview】 ■Required documents: Guide map, layout plan, floor plan, elevation plan, section drawing, foundation plan, various energy-saving related materials ■Estimated time required: Approximately 4 weeks (about 2 weeks for application submission and about 2 weeks for Q&A) *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company provides design support, CG architecture, and housing inspections. We assign dedicated personnel to each section, ensuring that data and information are seamlessly transferred without waste, and we maintain thorough consistency. We take on the cumbersome tasks, allowing you to focus on your core construction work. Additionally, with a track record of supporting over 700 buildings annually, we consistently collaborate across the sales process, from presentation drawings to the CG department, and then to the design and structural engineering departments. Therefore, there are various benefits, including not only the consistency of drawings but also time savings and cost reductions.