Responsible support until the confirmation application is approved! We can also handle the application process for interim inspections and final inspections.
Our company offers "Confirmation Application Support," where we create the necessary application documents for the confirmation application based on the drawings we receive and handle the application on your behalf. This service allows you to choose between two types of support: application document preparation assistance and comprehensive support that includes both application document preparation and application representation. With the application document preparation assistance, the application itself will be handled by the builder, while we will respond to inquiries and corrections from the evaluation agency. 【Detailed Information】 ■ Required Documents - Location map, site plan, floor plan, elevation drawings, public land map, urban planning map, average ground level calculation diagram (only if necessary) ■ Estimated Time Required - Approximately 4 weeks (about 2 weeks for application submission and about 2 weeks for inquiries and responses) *For more details, please refer to the related links or feel free to contact us.
Inquire About This Product
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Our company provides design support, CG architecture, and housing inspections. We assign dedicated personnel to each section, ensuring that data and information are seamlessly transferred without waste, and we maintain thorough consistency. We take on the cumbersome tasks, allowing you to focus on your core construction work. Additionally, with a track record of supporting over 700 buildings annually, we consistently collaborate across the sales process, from presentation drawings to the CG department, and then to the design and structural engineering departments. Therefore, there are various benefits, including not only the consistency of drawings but also time savings and cost reductions.