Shortened construction period! Direct ceiling finishing is possible! 'FR Board Slab Method'
The small beams can be omitted, allowing for flexible planning! By not using wooden formwork, we contribute to the Earth's environment!
We would like to introduce the "FR Slab Construction Method." The FR slab is a ribbed precast concrete slab, and the prestressing is introduced through PC steel materials arranged in the rib sections. The "FR Slab Construction Method" involves laying this FR slab on beam formwork, placing the upper reinforcement, and then pouring on-site concrete to integrate the components. 【Features】 ■ The underside of the FR slab is flat, allowing for direct ceiling finishing. ■ Small beams can be omitted, enabling flexible planning. ■ Long-term deflection due to creep is minimal. ■ By adopting the FRS method, it can accommodate floor level differences in areas such as water facilities. *For more details, please refer to the PDF materials or feel free to contact us.
Inquire About This Product
basic information
【Features of FR Board】 ■ Does not use wooden formwork during factory production and on-site construction ■ Contributes to the protection of the global environment *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
Fuji P.S. aims to be a leading company in the PC (prestressed concrete) construction industry based on the philosophy of "contributing to society." Please feel free to contact us if you have any inquiries.