This is a seminar focused on the challenges of machining workplaces. It will explain the new production systems and key points for production planning, taking into account the characteristics of the industry.
In the machining workplace, the demand for manufacturing with a variety of products in small quantities and high precision has led many factories to struggle with the challenge of improving productivity. Additionally, while customer demands for shorter delivery times are becoming increasingly stringent, there are also reports of delays due to poor coordination between processes. This seminar will explain a new production system and key points for production planning that aim to maximize the capabilities of operators in the machining workplace to overcome such challenges.
Inquire About This Product
basic information
◆Event◆ 1/19 (Fri) 13:30-14:30 [60 minutes] 1/31 (Wed) 13:30-14:30 [60 minutes] ◆About WEB Participation◆ We will use Cisco Webex Meetings. Only software installation is required, and there are no system usage fees. If installation is not possible, participation is also available via a browser. (Recommended browsers: Latest versions of Edge, Chrome, Firefox, Safari.) ◆Participation Fee◆ Free ◆Instructor◆ Hiroshi Tani, Consultant, Astec Consulting Co., Ltd. ◆Program◆ ❶ Characteristics and Issues of Machine Processing Workplaces ❷ Creating Flow and Strengthening Collaboration in Machine Processing Workplaces ❸ Drawing Out Operators' Abilities ❹ Increasing the Density of Operators' Work ◆Application Method◆ Please apply through our company website. https://www.ast-c.co.jp/seminar/technology.html#69
Price range
P1
Delivery Time
Applications/Examples of results
Recommended for such workplaces! - The production planning is personalized, making it time-consuming to create plans. - The production site cannot produce according to the production plan. - Poor coordination between processes leads to inconsistent workloads for operators. - There are many work-in-progress items, which are crowding the workspace. - Delays in delivery are frequent, and overtime is being used to cope with the situation.
catalog(1)
Download All CatalogsCompany information
Our company was founded in 2001 and provides practical consulting to support improvement activities in manufacturing, such as revenue enhancement, productivity improvement, lead time reduction, and inventory reduction, including the introduction of DX systems. Based on our unique production management method, the "One-Piece Flow Production System," we create customized original programs tailored to each company's management challenges, addressing everything from "on-site improvements" to "system improvements" and "production innovation," and provide appropriate solutions. If you encounter any issues that need to be addressed, please feel free to contact us. We will definitely provide solutions that satisfy your company. [Astech Consulting HP] https://www.ast-c.co.jp/