Asbestos Pre-Investigation | Nationwide Compliance with Qualified Personnel Requirements [98 people]
From the construction starting on October 1, a pre-investigation for asbestos by qualified personnel will be mandatory. We can provide one-stop nationwide support from investigation to countermeasures!
From the construction work starting on October 1, when performing tasks such as the demolition of buildings, it is necessary to conduct a preliminary survey by a "Building Asbestos Containing Material Surveyor." Our company has placed 98 qualified surveyors (as of September 2023) from Hokkaido to Kyushu, and we have established analysis facilities with nationally designated qualified personnel in four locations across the country. We also have 22 designated Building Asbestos Containing Material Surveyors capable of handling large-scale buildings. We provide a one-stop solution from survey to countermeasures with a variety of remedial works, including water jetting. We conduct document surveys, on-site surveys, sample collection, and analytical investigations in accordance with the law, and we respond to the removal of spray materials and others with the reliable technology of the "NS Clean Method (removal method)" to suppress dust generation. 【Recommended for those who】 ■ Plan to carry out demolition or renovation work but do not have the necessary qualified personnel for the preliminary survey ■ Have sites across the country but want to consolidate the contact point for preliminary surveys ■ Want to expedite remedial work based on survey results *For more details, please download the PDF or feel free to contact us.
Inquire About This Product
basic information
【Features of Ultra-High Pressure Water Jetting Method】 ■ Speedy removal at an average of 70m2 per day ■ Wastewater is neutralized through pH adjustment and precipitated with coagulants, then filtered through a filter after passing through clear water, and released into the sewer after passing water quality tests. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■ We propose suitable construction methods based on the presence of asbestos, the condition of building materials and structures, surrounding circumstances, demolition work, renovation work, project duration, and budget. *For more details, please download the PDF or feel free to contact us. (Equipment used for water jet method: 2 sets available) ■ Ultra-high pressure water generation pump - A high-performance unit combining a domestically produced diesel engine and a German-made plunger pump. It boasts an output of up to 245 MPa while achieving the industry's lowest noise levels through thorough soundproofing and vibration control. ■ Filter - Utilizing a hydrophilic PTFE membrane, it achieves a high purity level of 99% at 0.15 µm.
catalog(3)
Download All CatalogsCompany information
NS Environment Co., Ltd. is an environmental comprehensive consultant that addresses key social issues such as the realization of a "decarbonized society," "resource-circulating society," "nature-compatible society," and "prevention of environmental pollution," contributing to the construction of a sustainable society. We provide services through the following three businesses: Environmental Monitoring Business: Various analyses and measurements related to the environment (water quality, soil, air) Environmental Consulting Business: Various surveys, analyses, predictions, and evaluations related to the environment Environmental Engineering Business: Measures for environmental conservation (asbestos measures, soil and groundwater contamination)