A must-see for those considering implementation! 【Container Ramp (Van Stage) Case Studies】
Container ramp van stage
It's a movable three-part design that can be transported and set up anywhere with just one forklift, allowing you to choose the installation location freely!
We would like to introduce a case study of the introduction of the 【Container Ramp (Van Stage)】 at Shikibo Logistics Center Co., Ltd. They were using a fixed outdoor ramp for unloading products and faced challenges such as "products getting wet in rainy weather" and "the floor surface of the fixed ramp being slippery, which raised safety concerns, leading to time-consuming manual unloading." ■ A movable ramp that can be transported and set up anywhere with just one forklift, divided into three sections. ■ Original rib processing (barrel processing) that is slip-resistant even on rainy days, along with detachable side guards for fall prevention, were key factors in the decision to introduce the 【Container Ramp (Van Stage)】. After the introduction, they achieved improvements in 【safety】【work efficiency】, as well as 【labor savings】【time reduction】. = Features = 【Safety】 All-weather design with high grip for peace of mind even on rainy days. 【Work Efficiency】 Easy to stack in three tiers, with simple movement and storage. 【Labor Savings】 Assembly, operation, and cleanup can be done with just one forklift. 【Time Reduction】 Quick loading and unloading with a forklift. * A case study video is currently available! * For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
Related Videos
basic information
【Standard Basic Specifications】 Overall Length: Approximately 11,000mm Floor Height: 1,200 to 1,350mm Inclination Angle: 9 degrees Width: 2,130 (2,244) mm, Connection Part (2,447) mm Running Load: 7,500kg (Forklift + Load) Frame 1 Weight: 890kg, Length: Approximately 3,000mm Frame 2 Weight: 910kg, Length: Approximately 3,500mm Frame 3 Weight: 1,040kg, Length: Approximately 4,560mm *The values in parentheses include side guards.
Price information
2,450,000 yen (excluding shipping and tax) *Please contact us for shipping costs.
Price range
P5
Delivery Time
※Since it is a made-to-order product, it will take approximately 30 to 60 days after the order is received.
Applications/Examples of results
This is a device used to load and unload cargo from marine containers using a forklift in locations without platform equipment. Total sales by the manufacturer: over 2,000 units! (As of the end of March 2021) Our delivery record includes various industries such as transportation and communication, metal and metal product manufacturing, chemical manufacturing, textile manufacturing, food manufacturing, transportation machinery manufacturing, waste management, and recycling, among others, with a wide range of companies adopting our equipment!
Line up(1)
Model number | overview |
---|---|
Container Ramp Van Stage | [Labor Saving][Cost Reduction][Time Reduction][Workability][Safety] |
catalog(6)
Download All CatalogsCompany information
Aiming for a comfortable society with communication. As the world changes rapidly, new needs arise. We want to think about what those needs are and provide products and services that we can offer. Even though the times change, the fundamentals remain the same. Without mutual communication, business cannot thrive. It has been a long time since we started calling it an information society, but how we develop business while maintaining communication is our theme.