TometaroⓇ optional products, mortar that can increase water resistance, and it's easy to chisel! 【Water infiltration measures / waterproofing】
For projects involving the construction of renewable energy, flood prevention, and waterproofing, we propose safe and long-lasting water-stopping solutions. In addition to the optional products for the water-stopping putty TometaroⓇ, which prevent leaks at cable penetration points and recommend the "two-layer filling" method, we have developed additional options based on the requests of design companies and contractors, such as "I want to solidify the bell mouth opening" or "I want even higher water-tight performance." Our company recommends the "two-layer filling" method using "backup material + non-drying water-stopping material TometaroⓇ," but when filling the third layer opening with a fully cured finishing material, please use it in conjunction with TometaroⓇ and Hatsureeru. As the name suggests, Hatsureeru allows for easy and safe chiseling after filling when re-running cables. *For details, please request a catalog from "Contact Us" or view the PDF data from "Download"。
Inquire About This Product
Related Videos
basic information
<Product Specifications> - Content: 1 kg (bag) - Water addition: 200 ml (200 cc) - Curing time (room temperature): approximately 20 minutes (complete curing 24 hours) - Heat resistance: 750℃ - Water tightness (when used with Tome Taro): 0.15 MPa (Test conditions: 50 mm Tome Taro 50 mm) TometaroⓇ Channel [EPJ INC.] https://www.youtube.com/watch?v=9IncoRGrJHE&t=41s ~ Before starting the filling work, please be sure to check the YouTube filling video. If you have any questions regarding handling, please feel free to contact us at the information below ~ Contact: EPJ INC. TEL: +81 3-5643-8137 FAX: +81 3-5643-8138 Email: info@epj-inc.co.jp
Price range
Delivery Time
P1
Applications/Examples of results
Non-drying polyolefin-based one-component waterproofing putty TometarouⓇ <Optional Items - Delivery Achievements> - Chiba Prefecture ●●●●● Solar Power Plant Self-Managed Line Construction - Shizuoka Prefecture ●●● Junior College Auditorium Building New Construction - Hyogo Prefecture ●●●● Factory New Construction Flood Control Work - Ibaraki Prefecture ●● Logistics New Construction Flood Control Work - Chiba Prefecture ●●●● Large Commercial Facility Leak Repair Work - (Overseas) ODA Republic of Kenya Flood Control Work - Hokkaido ●●●●● Battery Storage Construction Work - Ibaraki Prefecture Japan ●●● Development Organization Flood Control Work etc. In addition to numerous construction projects [renewable energy development / flood control and waterproofing work for both public and private sectors], TometaroⓇ has been adopted. Please use it with confidence.
Detailed information
-
Chopping work [1]
-
Chopping work [2]
-
Chopping work [3]
-
Chopping work [4]
-
Chopping work [5]
-
Chopping work [6]
-
Chopping work [7]
-
Hatsureru Filling ~ Removal Video Youtube
Company information
A manufacturer specialized in planning, design, and engineering. We focus on product development to solve various issues at construction sites, providing innovative, cutting-edge, and ecological products. Please feel free to contact us.