[Construction Example] No electricity needed at all?! Sewage heat heat pipe snow melting facility
No electricity required at all! Tested for spot snow melting, and the effectiveness has been confirmed.
We would like to introduce a case of the "sewage heat heat pipe snow melting facility" constructed at the Niigata City Art Museum bus stop. The feature is that it relies solely on sewage heat for snow melting energy, requiring no electricity at all. It has been tested for spot snow melting at bus stops and similar locations, and the snow melting effect has been confirmed. 【Equipment Overview】 ■ Construction Year: Fiscal Year 2012 ■ Construction Location: Niigata City Art Museum Bus Stop ■ Client: Niigata City ■ Contractor: Kowa Co., Ltd. *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Other Equipment Overview】 ■ Snow melting area: 2.5m2 ■ Equipment overview: φ26.5mm corrugated heat pipes × 6 ■ Design snow melting heat output: 100W/m2 (measured 40–100W/m2) ■ Drainage temperature: 9–12℃ (measured) *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
catalog(1)
Download All CatalogsCompany information
A comfortable and convenient life, along with the blessings of nature. We need both of these. While making our communities safer and more comfortable, we must protect the natural environment. It's a challenging theme, but if we face it seriously, we can surely achieve it. What makes this possible is creativity and technology. Kowa will leverage the technical know-how we have accumulated and continue to strive for a balance between the two.