Introducing examples of the installation of gutter heaters as a measure against winter snowmelt and icicles!
We would like to introduce a case study of the installation of a horizontal gutter heater that we conducted. During the installation, the horizontal gutter had to be shortened because the installation location was shorter than planned to fit the house, resulting in the need to cut the gutter and change the heater connection from three panels to two. When running the wiring, it could not pass through due to the sparrow deterrent, so it was routed through the groove section. 【Case Overview】 ■ Date of Implementation: April 13, 2022, from 9:00 AM to 3:00 PM ■ Purpose: To install a horizontal gutter heater on the first floor of Mr. S's residence (as a measure against snow melting and icicles during winter) *For more details, please refer to the PDF document or feel free to contact us.
Inquire About This Product
basic information
【Installation Process】 ■1. Confirm the position of the gutter and heater ■2. Attach the heater ■3. Connect two pieces together ■4. Connect with plug-type pin terminals ■5. Apply Ace Cross 031 adhesive tape ■6. Install one piece at a time ■7. Pass the wiring through ■8. Connect the red and black wires to the 1.25 cable with pin terminals ■9. Waterproof the red and black wires and cable with vinyl tape ■10. Attach the cable to the control box ■11. Temporarily install the control box *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Company information
Since our establishment, we have delivered numerous products to society through clean printing and related processing technologies. In recent years, we have introduced inkjet machines and autoclaves as part of our corporate strategy, challenging ourselves in various fields.