Even unskilled workers can become immediately effective! Achieving efficiency in board manufacturing!
We would like to introduce how the introduction of "WIRE CAM DX" has addressed the strong sense of crisis regarding the aging of wiring workers at Daiichi Seisakusho Co., Ltd., which broadly engages in equipment design and system design, centered on the manufacturing of distribution boards, control panels, and sub-distribution boards. ■ Background of Introduction - A strong sense of crisis regarding the aging of wiring workers - Establishing a system where anyone can manufacture products with the same quality - Simultaneously aiming for standardization ■ Reasons for Adopting WIRE CAM DX - Adopted WIRE CAM DX, which allows wiring length measurement not only from ECAD DCX drawings but also from AutoCAD drawings, enabling manufacturing and data integration. ■ Effects After Introduction - Approximately 15% reduction in overall man-hours from design to manufacturing within about a year and a half after introduction. - Changed to allow wiring design based on standardized rules by digitizing wiring routes and know-how. - After about six months of training post-operation start, individuals can independently view drawings and perform wiring tasks. - By integrating data with wire processing machines, manual work has been mechanized, leading to reduced man-hours and improved quality. - Overall quality level of products has also improved.
Inquire About This Product
basic information
**Features of WIRE CAM DX** ■ In addition to CAD data, various files can be used for wiring design. *Available file types include ECAD, DWG, PDF, TIFF, etc.* ■ Wiring design allows for automatic route selection and wiring length measurement. ■ Data for mark tube processing can be output to processing machines, and wiring length data can be output to wire processing machines, enabling pre-processing of wires. *Compatible processing machine manufacturers include Mibu Electric Works, CTK, Koder Electronics, Lion Power, and others.* ■ By preparing wires in advance and conducting parallel operations, manufacturing lead time can be shortened. ■ Component installation and wiring tasks can be converted to non-technical personnel, allowing for an increase in production volume through the establishment of a division of labor system. *For more details, please refer to the documentation. Feel free to contact us with any inquiries.*
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please download the catalog or contact us.
catalog(12)
Download All Catalogs





News about this product(2)
Company information
The dedicated CAD solution for electrical design, the "ECAD Series," has been supporting Japan's manufacturing for 40 years by responding to customer needs and accumulating top-class achievements in the industry. At ECAD Solutions, under our corporate philosophy of "providing products and services that lead to customer satisfaction," we will continue to offer total solutions that satisfy our customers with our accumulated experience and know-how.